Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 156
Message text: Product &2 at location &1: Unneccessary material destruction
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT156
- Product &2 at location &1: Unneccessary material destruction ?The SAP error message
/SAPAPO/SNPOPT156
indicates that there is unnecessary material destruction for a specific product at a given location. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly in supply chain management scenarios.Cause:
The error message is triggered when the system detects that there is a planned action that would lead to the destruction of inventory that is not necessary. This can happen due to several reasons, including:
- Excess Inventory: The system may have determined that there is more inventory on hand than is needed to meet demand, leading to planned destruction.
- Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to unnecessary destruction of materials.
- Demand Fluctuations: Changes in demand forecasts that are not aligned with the current inventory levels can result in planned destruction.
- Production Planning Issues: If production plans are not aligned with actual sales or demand, it can lead to excess stock that needs to be written off.
Solution:
To resolve this error, consider the following steps:
- Review Inventory Levels: Check the current inventory levels for the product at the specified location. Ensure that the inventory is aligned with the demand forecast.
- Adjust Planning Parameters: Review and adjust the planning parameters in the APO system. This includes safety stock levels, reorder points, and other relevant settings.
- Analyze Demand Forecasts: Re-evaluate the demand forecasts to ensure they are accurate and reflect current market conditions. Adjust forecasts if necessary.
- Check Production Plans: Ensure that production plans are in sync with actual sales and demand. If there are discrepancies, adjust the production schedule accordingly.
- Consult with Stakeholders: Engage with relevant stakeholders (e.g., sales, production, and supply chain teams) to understand the reasons behind the excess inventory and to develop a coordinated approach to manage it.
- Use APO Tools: Utilize APO tools and reports to analyze the situation further. Tools like the Supply Network Planning (SNP) can help identify the root cause of the excess inventory.
Related Information:
By following these steps, you should be able to address the issue of unnecessary material destruction and prevent it from occurring in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT155
Product &2 in location &1: Safety stock contradicts maximum stock
What causes this issue? A safety stock of &V3& was specified for product &V2& at location &V1&. This is higher than the maxim...
/SAPAPO/SNPOPT154
Resource &1: incomplete cost function for capacity increase
What causes this issue? The piecewise linear cost function for increasing the capacity of resource &V1& was only defined for an increase of a...
/SAPAPO/SNPOPT157
PPM/PDS &1 is using more than 1 resource for lot size planning
What causes this issue? Production process model &V1& is using &V2& resources that are intended for cross-period lot size planning. &...
/SAPAPO/SNPOPT158
Production process model/PDS &1: Fixed resource consumption not allowed
What causes this issue? Production process model &V1& is using resource &V2& that is intended for cross-period lot size planning. How...
Click on this link to search all SAP messages.