Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 154
Message text: Resource &1: incomplete cost function for capacity increase
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT154
- Resource &1: incomplete cost function for capacity increase ?The SAP error message /SAPAPO/SNPOPT154 Resource &1: incomplete cost function for capacity increase typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with capacity planning and optimization scenarios. This error indicates that there is an issue with the cost function associated with a resource that is being used for capacity increase.
Cause: Incomplete Cost Function Definition: The cost function for the resource in question has not been fully defined. This could mean that certain parameters or values required for the cost function are missing or incorrectly configured. Resource
Configuration Issues: The resource may not be properly set up in the system, leading to incomplete or incorrect data being used in the optimization process. Missing Cost Data: There may be missing cost data for the resource, which is necessary for the optimization algorithm to calculate the costs associated with increasing capacity.
Solution: Check Cost Function Configuration: Navigate to the resource master data
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNPOPT153
Production process model/PDS &1 at location &2: Incomplete cost function
What causes this issue? The piecewise linear cost function for executing production process model &V1& at location &V2& was only defi...
/SAPAPO/SNPOPT152
Product &1 at transportation lane &2: Incomplete transportn cost function
What causes this issue? The piecewise linear cost function for transporting product &V1& on transportation lane &V2& was only defined...
/SAPAPO/SNPOPT155
Product &2 in location &1: Safety stock contradicts maximum stock
What causes this issue? A safety stock of &V3& was specified for product &V2& at location &V1&. This is higher than the maxim...
/SAPAPO/SNPOPT156
Product &2 at location &1: Unneccessary material destruction
What causes this issue? Product &V2& at location &V1& has a limited shelf life and can be externally procured. The costs for destroyi...
Click on this link to search all SAP messages.