How To Fix /SAPAPO/SNPOPT157 - PPM/PDS &1 is using more than 1 resource for lot size planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SNPOPT -

  • Message number: 157

  • Message text: PPM/PDS &1 is using more than 1 resource for lot size planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNPOPT157 - PPM/PDS &1 is using more than 1 resource for lot size planning ?

    The SAP error message /SAPAPO/SNPOPT157 indicates that a Production Planning Model (PPM) or a Product Data Structure (PDS) is configured to use more than one resource for lot size planning. This can lead to inconsistencies or complications in the planning process, as the system expects a single resource to be used for lot size calculations.

    Cause:

    1. Multiple Resources Defined: The PPM or PDS has been set up with multiple resources for the same operation, which is not allowed for lot size planning.
    2. Configuration Issues: The configuration of the PPM or PDS may not align with the requirements for lot size planning, leading to this error.
    3. Resource Assignment: The resources assigned to the operation may not be properly defined or may overlap in a way that confuses the planning logic.

    Solution:

    1. Review Resource Assignment:

      • Go to the PPM or PDS in question and check the resource assignments.
      • Ensure that only one resource is assigned for the lot size planning operation.
    2. Modify PPM/PDS:

      • If multiple resources are necessary for production, consider creating separate operations for each resource instead of assigning them to the same operation.
      • Adjust the PPM or PDS to ensure that it complies with the requirement of having a single resource for lot size planning.
    3. Check Lot Size Settings:

      • Review the lot size settings in the PPM or PDS to ensure they are correctly configured.
      • Make sure that the lot size strategy aligns with the resource configuration.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidelines on configuring PPMs and PDSs for lot size planning.
    5. Testing:

      • After making changes, run a test planning run to ensure that the error is resolved and that the planning behaves as expected.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • Transaction Codes: Use transaction codes like /SAPAPO/PPM or /SAPAPO/PDS to access and modify the PPM or PDS.
    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered and resolved similar issues.
    • Training and Documentation: Consider training sessions or documentation on Advanced Planning and Optimization (APO) to better understand resource planning and configuration.

    By following these steps, you should be able to resolve the error and ensure that your PPM or PDS is correctly configured for lot size planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author