Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 157
Message text: PPM/PDS &1 is using more than 1 resource for lot size planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT157
- PPM/PDS &1 is using more than 1 resource for lot size planning ?The SAP error message
/SAPAPO/SNPOPT157
indicates that a Production Planning Model (PPM) or a Product Data Structure (PDS) is configured to use more than one resource for lot size planning. This can lead to inconsistencies or complications in the planning process, as the system expects a single resource to be used for lot size calculations.Cause:
- Multiple Resources Defined: The PPM or PDS has been set up with multiple resources for the same operation, which is not allowed for lot size planning.
- Configuration Issues: The configuration of the PPM or PDS may not align with the requirements for lot size planning, leading to this error.
- Resource Assignment: The resources assigned to the operation may not be properly defined or may overlap in a way that confuses the planning logic.
Solution:
Review Resource Assignment:
- Go to the PPM or PDS in question and check the resource assignments.
- Ensure that only one resource is assigned for the lot size planning operation.
Modify PPM/PDS:
- If multiple resources are necessary for production, consider creating separate operations for each resource instead of assigning them to the same operation.
- Adjust the PPM or PDS to ensure that it complies with the requirement of having a single resource for lot size planning.
Check Lot Size Settings:
- Review the lot size settings in the PPM or PDS to ensure they are correctly configured.
- Make sure that the lot size strategy aligns with the resource configuration.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on configuring PPMs and PDSs for lot size planning.
Testing:
- After making changes, run a test planning run to ensure that the error is resolved and that the planning behaves as expected.
Related Information:
/SAPAPO/PPM
or /SAPAPO/PDS
to access and modify the PPM or PDS.By following these steps, you should be able to resolve the error and ensure that your PPM or PDS is correctly configured for lot size planning.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNPOPT156
Product &2 at location &1: Unneccessary material destruction
What causes this issue? Product &V2& at location &V1& has a limited shelf life and can be externally procured. The costs for destroyi...
/SAPAPO/SNPOPT155
Product &2 in location &1: Safety stock contradicts maximum stock
What causes this issue? A safety stock of &V3& was specified for product &V2& at location &V1&. This is higher than the maxim...
/SAPAPO/SNPOPT158
Production process model/PDS &1: Fixed resource consumption not allowed
What causes this issue? Production process model &V1& is using resource &V2& that is intended for cross-period lot size planning. How...
/SAPAPO/SNPOPT159
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& at location &V2& is intended for cross-period lot size planning. It can be star...