Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 133
Message text: Quantity-firmed order with quantity &1 &2 in new task list (AONEW)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ133
- Quantity-firmed order with quantity &1 &2 in new task list (AONEW) ?The SAP error message
/SAPAPO/SEQ133
indicates that there is a quantity-firmed order with a specific quantity that is being referenced in a new task list. This error typically arises in the context of Advanced Planning and Optimization (APO) when there are discrepancies or conflicts in the order quantities during planning activities.Cause:
- Quantity Conflict: The error usually occurs when there is a mismatch between the quantity of the firmed order and the quantities being processed in the new task list. This can happen if the order has been modified or if there are changes in the planning parameters.
- Task List Issues: The new task list may not be properly aligned with the existing firmed orders, leading to conflicts in the planning process.
- Data Inconsistencies: There may be inconsistencies in the master data or transaction data that are causing the system to flag this error.
Solution:
- Review Firmed Orders: Check the firmed orders in the system to ensure that their quantities are correct and that they match the expected values in the new task list.
- Adjust Task List: If necessary, adjust the new task list to ensure that it aligns with the existing firmed orders. This may involve modifying the quantities or re-evaluating the planning parameters.
- Reprocess Planning: After making the necessary adjustments, reprocess the planning run to see if the error persists. This may involve running the planning function again or refreshing the planning data.
- Check Master Data: Ensure that all relevant master data (e.g., material master, production resources/tools) is accurate and up to date. Inconsistencies in master data can lead to planning errors.
- Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional troubleshooting steps or patches that may address the issue.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC90
(for checking the planning run) to analyze the situation further.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ132
Order must have lot size >=1 &2. Actual quantity is &1 &2
What causes this issue? A firmed order exists in the period determined for optimization with an order quantity greater than 1.System Response As thi...
/SAPAPO/SEQ131
No item determined. Order lies outside the optimization period
What causes this issue? An internal error occurred. An order lies outside the optimization period.System Response The system issues an error message...
/SAPAPO/SEQ134
Order &1 has lot size &2
What causes this issue? In Customizing, you have selected the <DS:DE./SAPAPO/SEQ_PLANNING_BASIS>planning basis</> <LS>order-oriente...
/SAPAPO/SEQ135
Not enough capacity in current optimization period
What causes this issue? The splitting of the orders in the period must be terminated as not enough capacity is available.System Response The system ...
Click on this link to search all SAP messages.