How To Fix /SAPAPO/SEQ135 - Not enough capacity in current optimization period


/SAPAPO/SEQ135 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 135

  • Message text: Not enough capacity in current optimization period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SEQ135 - Not enough capacity in current optimization period ?
    The SAP error message /SAPAPO/SEQ135 Not enough capacity in current optimization period typically occurs in the context of Advanced Planning and Optimization (APO) when there is insufficient capacity to fulfill the planned production or procurement activities within the specified optimization period. This can happen during the planning run when the system tries to allocate resources (like machines or labor) to production orders or planned orders, but finds that the available capacity is not enough to meet the demand.
    Causes:
    
    Insufficient Capacity: The most common cause is that the available capacity for the resources (work centers, production lines, etc.) is lower than the required capacity to meet the planned orders.
    Incorrect Capacity Planning: Capacity may not have been correctly defined in the system, such as incorrect working hours, shifts, or resource availability.
    High Demand: A sudden increase in demand or changes in the production plan can lead to capacity shortages.
    Resource Constraints: Specific resources may be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant