Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 131
Message text: No item determined. Order lies outside the optimization period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ131
- No item determined. Order lies outside the optimization period ?The SAP error message /SAPAPO/SEQ131 No item determined. Order lies outside the optimization period typically occurs in the context of SAP Advanced Planning and Optimization (APO) when the system is unable to find a suitable item for a given order because the order's scheduling falls outside the defined optimization period.
Cause: Optimization Period Settings: The optimization period is defined in the planning settings. If the order's requested delivery date or production date is outside this period, the system will not consider it for planning. Order Dates: The order may have been created with dates that are not within the planning horizon set in the system. Planning Version: The planning version being used may not include the order due to its settings or configuration. Master Data Issues: There may be issues with the master data (e.g., product, location, or resource) that prevent the order from being processed.
Solution: Adjust Optimization Period: Review and, if necessary, extend the optimization
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ130
No timing pattern determined for horizon &1 to &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ129
Two production versions exist for a planning area in the horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ132
Order must have lot size >=1 &2. Actual quantity is &1 &2
What causes this issue? A firmed order exists in the period determined for optimization with an order quantity greater than 1.System Response As thi...
/SAPAPO/SEQ133
Quantity-firmed order with quantity &1 &2 in new task list (AONEW)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.