How To Fix /SAPAPO/SEQ113 - No complete shift exists for line &1 in the selected horizon


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 113

  • Message text: No complete shift exists for line &1 in the selected horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SEQ113 - No complete shift exists for line &1 in the selected horizon ?

    The SAP error message /SAPAPO/SEQ113 No complete shift exists for line &1 in the selected horizon typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling. This error indicates that the system cannot find a complete shift for a specific production line within the defined planning horizon.

    Cause:

    1. Shift Definition Issues: The shift may not be defined correctly in the system. This could be due to missing or incorrect shift definitions in the master data.
    2. Planning Horizon: The planning horizon set in the system may not cover the time period for which the production line is scheduled.
    3. Production Line Configuration: The production line may not have been configured properly, or it may not be active during the specified time.
    4. Calendar Settings: The factory calendar or shift calendar may not be set up correctly, leading to discrepancies in available shifts.
    5. Data Inconsistencies: There may be inconsistencies in the data related to the production line, such as missing entries in the relevant tables.

    Solution:

    1. Check Shift Definitions: Verify that the shifts are defined correctly in the system. Go to the relevant configuration settings in SAP APO and ensure that the shifts are set up for the production line in question.
    2. Review Planning Horizon: Ensure that the planning horizon is set appropriately. You may need to extend the planning horizon to include the required time frame.
    3. Validate Production Line Configuration: Check the configuration of the production line to ensure it is active and has the necessary settings for production.
    4. Examine Calendar Settings: Review the factory and shift calendars to ensure they are correctly configured and that the shifts are available during the required time.
    5. Data Consistency Check: Perform a data consistency check to identify any missing or incorrect entries related to the production line and shifts.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as /SAPAPO/SDP94 (for planning board) or /SAPAPO/MC90 (for master data) to check and modify the relevant settings.
    • Documentation: Refer to SAP documentation or help guides related to shift planning and production scheduling in APO for detailed instructions on configuration.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    By following these steps, you should be able to identify and resolve the cause of the error message /SAPAPO/SEQ113.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant