Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 113
Message text: No complete shift exists for line &1 in the selected horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ113
- No complete shift exists for line &1 in the selected horizon ?The SAP error message /SAPAPO/SEQ113 No complete shift exists for line &1 in the selected horizon typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling. This error indicates that the system cannot find a complete shift for a specific production line within the defined planning horizon.
Cause: Shift Definition Issues: The shift may not be defined correctly in the system. This could be due to missing or incorrect shift definitions in the master data. Planning Horizon: The planning horizon set in the system may not cover the time period for which the production line is scheduled. Production Line Configuration: The production line may not have been configured properly, or it may not be active during the specified time. Calendar Settings: The factory calendar or shift calendar may not be set up correctly, leading to discrepancies in available shifts. Data Inconsistencies: There may be inconsistencies in
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ112
New order activity cannot be determined after quantity change
What causes this issue? An internal error has occurred. The quantity of an order was changed. Therefore, it receives a new activity. You have to dete...
/SAPAPO/SEQ111
Deallocation of an activity failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ114
Production rate of line resource is 0
What causes this issue? The production rate of the line resource has not been maintained.System Response Access to the sequence schedule or to the m...
/SAPAPO/SEQ115
LP procedure: First section not defined as planning segment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.