Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 112
Message text: New order activity cannot be determined after quantity change
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ112
- New order activity cannot be determined after quantity change ?The SAP error message
/SAPAPO/SEQ112
indicates that the system is unable to determine a new order activity after a quantity change in the Advanced Planning and Optimization (APO) module. This error typically arises in the context of production planning and scheduling when there are inconsistencies or issues with the order data.Causes:
- Inconsistent Data: The order data may be inconsistent or incomplete, leading to the system's inability to determine the new order activity.
- Missing Master Data: Required master data (like resources, production versions, or BOMs) may be missing or incorrectly configured.
- Capacity Constraints: There may be capacity constraints that prevent the system from scheduling the new order activity.
- Order Status: The status of the order may not allow for changes, or the order may be in a state that does not permit quantity adjustments.
- Planning Version Issues: The planning version being used may not be correctly set up or may not have the necessary data.
Solutions:
- Check Order Data: Review the order data for inconsistencies or missing information. Ensure that all required fields are filled out correctly.
- Verify Master Data: Ensure that all relevant master data (like resources, production versions, and BOMs) is correctly set up and available in the system.
- Review Capacity Planning: Check the capacity planning settings to ensure that there are no constraints preventing the scheduling of the new order activity.
- Order Status Review: Check the status of the order to ensure it is in a state that allows for quantity changes. If necessary, change the status to allow modifications.
- Planning Version Check: Ensure that the correct planning version is being used and that it contains all necessary data for the order.
- Re-run Planning: If changes have been made to the order or master data, re-run the planning process to see if the error persists.
Related Information:
/SAPAPO/ORDR
to view and manage orders or /SAPAPO/MC90
for planning board activities.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ111
Deallocation of an activity failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ110
Status change of an activity failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ113
No complete shift exists for line &1 in the selected horizon
What causes this issue? No complete shift exists in the selected horizon for the selected line.System Response The transaction returns to the initia...
/SAPAPO/SEQ114
Production rate of line resource is 0
What causes this issue? The production rate of the line resource has not been maintained.System Response Access to the sequence schedule or to the m...
Click on this link to search all SAP messages.