Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 115
Message text: LP procedure: First section not defined as planning segment
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ115
- LP procedure: First section not defined as planning segment ?The SAP error message
/SAPAPO/SEQ115 LP procedure: First section not defined as planning segment
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when working with the LP (Linear Programming) procedure in the context of supply chain planning. This error indicates that the first section of the LP procedure is not defined as a planning segment, which is necessary for the LP procedure to function correctly.Cause:
- Missing Planning Segment Definition: The LP procedure requires that the first section is defined as a planning segment. If this is not set up correctly, the system will throw this error.
- Configuration Issues: There may be issues in the configuration of the LP procedure or the planning area that prevent the system from recognizing the first section as a planning segment.
- Incorrect Model Setup: The model or the planning area may not be set up correctly, leading to this error.
Solution:
Check LP Procedure Configuration:
- Go to the configuration of the LP procedure in the SAP APO system.
- Ensure that the first section is defined as a planning segment. You can do this by navigating to the relevant configuration settings in the SAP APO system.
Define Planning Segments:
- If the first section is not defined as a planning segment, you need to define it. This can typically be done in the planning area settings or the LP procedure settings.
- Make sure that the planning segments are correctly defined and that they align with the requirements of your planning model.
Review Planning Area Settings:
- Check the planning area settings to ensure that all necessary segments are defined and configured correctly.
- Ensure that the planning area is activated and that all relevant data is available.
Consult Documentation:
- Refer to the SAP documentation for detailed steps on how to configure LP procedures and planning segments. This can provide insights into any additional settings that may be required.
Testing:
- After making the necessary changes, test the LP procedure again to ensure that the error is resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP APO expert or your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ114
Production rate of line resource is 0
What causes this issue? The production rate of the line resource has not been maintained.System Response Access to the sequence schedule or to the m...
/SAPAPO/SEQ113
No complete shift exists for line &1 in the selected horizon
What causes this issue? No complete shift exists in the selected horizon for the selected line.System Response The transaction returns to the initia...
/SAPAPO/SEQ116
&1 orders which have already been released are moved on time axis
What causes this issue? Orders exist in the planning period with either status released, started, partially confirmed or completely confirmed.System ...
/SAPAPO/SEQ117
&1 firmed orders with lot sizes other than one are split
What causes this issue? Firmed orders with a lot size not equal to 1 exist in the planning period. Orders must have a lot size of 1 to be processed i...
Click on this link to search all SAP messages.