Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 602
Message text: Selected strategy for overload is finite
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT602
- Selected strategy for overload is finite ?The SAP error message /SAPAPO/RRP_PT602 Selected strategy for overload is finite typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling. This error indicates that the selected strategy for handling overload situations is set to "finite," meaning that it cannot exceed the available capacity.
Cause: Finite Capacity Planning: The error arises when the system attempts to schedule production or resources beyond their available capacity. In finite capacity planning, the system does not allow for overloading resources, which can lead to this error if the demand exceeds the available capacity.
Configuration Issues: The planning strategy or resource settings may not be configured correctly, leading to conflicts between demand and available capacity. Demand Exceeds Capacity: The planned orders or production orders may exceed the available capacity of the resources, causing the system to trigger this error.
Solution: Review Capacity Settings: Check the capacity settings for the resources
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_PT601
Selected scheduling strategy is infinite
What causes this issue? You selected a scheduling strategy with infinite scheduling. However, only the strategies with finite planning make sense whe...
/SAPAPO/RRP_PT600
******** Comment - Messages for REM heuristics ********
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT603
Could not create all of the orders in liveCache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT604
Update not complete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.