How To Fix /SAPAPO/RRP_PT602 - Selected strategy for overload is finite


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 602

  • Message text: Selected strategy for overload is finite

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT602 - Selected strategy for overload is finite ?

    The SAP error message /SAPAPO/RRP_PT602 Selected strategy for overload is finite typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling. This error indicates that the selected strategy for handling overload situations is set to "finite," meaning that it cannot exceed the available capacity.

    Cause:

    1. Finite Capacity Planning: The error arises when the system attempts to schedule production or resources beyond their available capacity. In finite capacity planning, the system does not allow for overloading resources, which can lead to this error if the demand exceeds the available capacity.
    2. Configuration Issues: The planning strategy or resource settings may not be configured correctly, leading to conflicts between demand and available capacity.
    3. Demand Exceeds Capacity: The planned orders or production orders may exceed the available capacity of the resources, causing the system to trigger this error.

    Solution:

    1. Review Capacity Settings: Check the capacity settings for the resources involved. Ensure that the available capacity is correctly defined and that it aligns with the production requirements.
    2. Adjust Demand: If possible, adjust the planned orders or production orders to ensure that they do not exceed the available capacity. This may involve rescheduling or reducing the quantity of orders.
    3. Change Planning Strategy: If the business process allows, consider changing the planning strategy from finite to infinite capacity. However, this should be done with caution, as it may lead to other issues such as overloading resources.
    4. Use Alternative Resources: If there are alternative resources available, consider using them to alleviate the overload situation.
    5. Check for Bottlenecks: Identify any bottlenecks in the production process that may be causing the overload and address them accordingly.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/RRP3 (Product View) or /SAPAPO/RRP4 (Resource View) to analyze the situation further.
    • Capacity Planning: Familiarize yourself with the concepts of capacity planning in SAP APO, including finite vs. infinite capacity planning.
    • SAP Notes: Check for any relevant SAP Notes or documentation that may provide additional insights or updates related to this error message.
    • Training and Documentation: Consider reviewing SAP training materials or documentation related to production planning and capacity management in APO.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and continue with your planning activities in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant