Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 601
Message text: Selected scheduling strategy is infinite
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT601
- Selected scheduling strategy is infinite ?The SAP error message /SAPAPO/RRP_PT601 Selected scheduling strategy is infinite typically occurs in the context of Advanced Planning and Optimization (APO) within SAP. This error indicates that the scheduling strategy selected for a particular planning object (like a product or a location) is set to "infinite," which means that the system cannot determine a finite planning horizon for the scheduling process.
Cause: Infinite Scheduling Strategy: The scheduling strategy assigned to the product or location is set to infinite, which is not compatible with certain planning processes that require a finite time frame.
Configuration Issues: There may be a misconfiguration in the planning settings or master data that leads to the selection of an infinite scheduling strategy. Master Data Issues: The product master or location master data may not be correctly set up, leading to the selection of an inappropriate scheduling strategy.
Solution: Check Scheduling Strategy: Go to the product master data in APO and check the scheduling
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_PT600
******** Comment - Messages for REM heuristics ********
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT550
No product was selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT602
Selected strategy for overload is finite
What causes this issue? You selected a scheduling strategy with finite scheduling. However, only the strategies with infinite scheduling make sense w...
/SAPAPO/RRP_PT603
Could not create all of the orders in liveCache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.