How To Fix /SAPAPO/RRP_PT601 - Selected scheduling strategy is infinite


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 601

  • Message text: Selected scheduling strategy is infinite

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT601 - Selected scheduling strategy is infinite ?

    The SAP error message /SAPAPO/RRP_PT601 Selected scheduling strategy is infinite typically occurs in the context of Advanced Planning and Optimization (APO) within SAP. This error indicates that the scheduling strategy selected for a particular planning object (like a product or a location) is set to "infinite," which means that the system cannot determine a finite planning horizon for the scheduling process.

    Cause:

    1. Infinite Scheduling Strategy: The scheduling strategy assigned to the product or location is set to infinite, which is not compatible with certain planning processes that require a finite time frame.
    2. Configuration Issues: There may be a misconfiguration in the planning settings or master data that leads to the selection of an infinite scheduling strategy.
    3. Master Data Issues: The product master or location master data may not be correctly set up, leading to the selection of an inappropriate scheduling strategy.

    Solution:

    1. Check Scheduling Strategy:

      • Go to the product master data in APO and check the scheduling strategy assigned to the product.
      • If it is set to infinite, consider changing it to a finite scheduling strategy that suits your planning needs.
    2. Review Configuration:

      • Check the configuration settings in the APO system for the planning area and the relevant planning object.
      • Ensure that the scheduling strategies are correctly defined and that there are no conflicts in the settings.
    3. Adjust Master Data:

      • Review the master data for the product or location in question. Ensure that all relevant fields are filled out correctly and that the scheduling strategy aligns with the overall planning process.
      • If necessary, update the master data to reflect a finite scheduling strategy.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for detailed information on scheduling strategies and their implications in APO.
    5. Testing:

      • After making changes, perform a test run to ensure that the error does not occur again and that the planning process works as expected.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional guidance on scheduling strategies in APO.
    • APO Configuration Guides: Review configuration guides for APO to understand how scheduling strategies are set up and managed.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to resolve the error and ensure that your scheduling strategy is appropriately configured for your planning needs.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author