Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 600
Message text: ******** Comment - Messages for REM heuristics ********
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT600
- ******** Comment - Messages for REM heuristics ******** ?The SAP error message /SAPAPO/RRP_PT600 is related to the Advanced Planning and Optimization (APO) module in SAP, specifically concerning the heuristic processes used in the Production Planning and Detailed Scheduling (PP/DS) area. This message typically indicates that there are issues with the heuristic run for the Resource-Event Management (REM) process.
Cause: The error message can arise due to several reasons, including but not limited to: Data Issues: Missing or incorrect master data (like resources, products, or production versions) can lead to heuristic failures. Configuration Problems: Incorrect settings in the heuristic configuration or parameters can cause the heuristic to not execute properly. Capacity Constraints: If the resources are overbooked or if there are capacity constraints that cannot be resolved, the heuristic may fail. Planning Object Issues: Problems with the planning objects being used in the heuristic, such as incorrect planning versions or planning areas. Heuristic Logic: The specific logic of the heuristic being used may not be suitable
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_PT550
No product was selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT540
No quantities found in period specified/selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT601
Selected scheduling strategy is infinite
What causes this issue? You selected a scheduling strategy with infinite scheduling. However, only the strategies with finite planning make sense whe...
/SAPAPO/RRP_PT602
Selected strategy for overload is finite
What causes this issue? You selected a scheduling strategy with finite scheduling. However, only the strategies with infinite scheduling make sense w...
Click on this link to search all SAP messages.