Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 604
Message text: No planned delivery time exists for product &1 in location &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR604
- No planned delivery time exists for product &1 in location &2 ?The SAP error message
/SAPAPO/RRP_HEUR604 No planned delivery time exists for product &1 in location &2
typically occurs in the context of Advanced Planning and Optimization (APO) when the system is trying to perform a heuristic or planning run, but it cannot find a planned delivery time for a specific product at a given location.Cause:
Missing Data: The most common cause of this error is that the planned delivery time has not been maintained for the product in the location master data. This could be due to:
- The product not being set up correctly in the system.
- The location not having the necessary data for the product.
- The planned delivery time not being defined in the product master or location product master.
Incorrect Configuration: There may be issues with the configuration of the planning area or the planning book that is being used, which could lead to the system not being able to retrieve the planned delivery time.
Data Synchronization Issues: If there are issues with data synchronization between SAP ERP and SAP APO, it may lead to missing or outdated information.
Solution:
Maintain Planned Delivery Time:
- Go to the product master data in APO and check if the planned delivery time is maintained for the product in the specific location.
- If it is missing, you can enter the planned delivery time in the product master or location product master.
Check Location Product Master:
- Ensure that the location product master is correctly set up for the product in question. You can do this by navigating to the location product master and verifying the relevant fields.
Review Planning Area Configuration:
- Check the configuration of the planning area and planning book to ensure that they are set up correctly to include the necessary data fields.
Data Synchronization:
- If you suspect data synchronization issues, check the integration between SAP ERP and SAP APO. Ensure that the master data is correctly replicated and up to date.
Consult Documentation:
- Review SAP documentation or notes related to this error message for any additional insights or specific steps that may be required based on your system configuration.
Related Information:
/SAPAPO/MAT1
to maintain product master data or /SAPAPO/LOC1
for location master data.By following these steps, you should be able to resolve the error and ensure that the planned delivery time is correctly maintained for the product at the specified location.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR603
The PP/DS horizon is zero days for product &1 in location &2
What causes this issue? The <DS:GLOS.123C87C4AE4AD511AE750800062AFB0F>PP/DS horizon</> is zero days for product &V1& in location ...
/SAPAPO/RRP_HEUR602
Orders outside the PP/DS horizon are not created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR605
The planned delivery time is zero days for product &1 in location &2
What causes this issue? The <DS:DE./SAPAPO/PLIFZ>planned delivery time</> for product &V1& in location &V2& is zero days....
/SAPAPO/RRP_HEUR606
Pegging horizon &1 is not supported
What causes this issue? The pegging horizon &V1& is not supported.System Response This means that the heuristic cannot be executed.How to fi...
Click on this link to search all SAP messages.