How To Fix /SAPAPO/RRP_HEUR603 - The PP/DS horizon is zero days for product &1 in location &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 603

  • Message text: The PP/DS horizon is zero days for product &1 in location &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_HEUR603 - The PP/DS horizon is zero days for product &1 in location &2 ?
    The SAP error message /SAPAPO/RRP_HEUR603 indicates that the Production Planning and Detailed Scheduling (PP/DS) horizon is set to zero days for a specific product at a given location. This means that the system does not have any planning horizon to work with for that product, which can lead to issues in scheduling and planning.
    
    Cause: Horizon Configuration: The planning horizon for the product in the location may not be defined or has been set to zero. This can happen due to incorrect settings in the master data or planning parameters. Product Master Data: The product master data may not have been properly maintained, leading to a lack of planning horizon. Location Master Data: Similar issues can arise from the location master data not being correctly configured. Planning Version: The planning version being used may not have the necessary settings or data for the product and location. Time Period Settings: The time period settings in the planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant