Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 602
Message text: Orders outside the PP/DS horizon are not created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR602
- Orders outside the PP/DS horizon are not created ?The SAP error message
/SAPAPO/RRP_HEUR602
indicates that orders cannot be created because they fall outside the Production Planning and Detailed Scheduling (PP/DS) horizon. This error typically arises in the context of planning and scheduling within the SAP Advanced Planning and Optimization (APO) module.Cause:
- Horizon Settings: The PP/DS horizon is defined in the system settings, and it specifies the time frame within which planning and scheduling can occur. If an order is scheduled to be created outside this defined horizon, the system will not allow it.
- Order Dates: The dates associated with the orders (e.g., start date, end date) may be outside the defined planning horizon.
- Configuration Issues: There may be misconfigurations in the planning settings or master data that lead to the orders being scheduled incorrectly.
Solution:
Adjust the PP/DS Horizon:
- Navigate to the configuration settings for the PP/DS horizon in the SAP system.
- Increase the planning horizon to include the dates of the orders that are being created.
- This can typically be done in the transaction code
/SAPAPO/PPDS_HORIZON
or through the relevant customizing settings in the SAP IMG.Check Order Dates:
- Review the order dates to ensure they are within the defined PP/DS horizon.
- If necessary, adjust the order dates to fall within the planning horizon.
Review Master Data:
- Ensure that the master data (e.g., production resources/tools, work centers) is correctly configured and that the relevant settings align with the planning horizon.
Run Planning Runs:
- After making adjustments, run the planning runs again to see if the orders can now be created.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed guidance on configuring the PP/DS horizon and understanding the implications of the settings.
Related Information:
/SAPAPO/PPDS_HORIZON
, /SAPAPO/MC90
(for planning runs), and /SAPAPO/RRP3
(for interactive planning).By addressing the cause of the error and implementing the suggested solutions, you should be able to resolve the issue and successfully create the necessary orders within the PP/DS horizon.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR601
You have not defined the PP/DS horizon for product &1 in location &2
What causes this issue? The <DS:GLOS.123C87C4AE4AD511AE750800062AFB0F>PP/DS horizon</> has not been defined for product &V1& in l...
/SAPAPO/RRP_HEUR600
************ Fixed Pegging Heuristics *************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR603
The PP/DS horizon is zero days for product &1 in location &2
What causes this issue? The <DS:GLOS.123C87C4AE4AD511AE750800062AFB0F>PP/DS horizon</> is zero days for product &V1& in location ...
/SAPAPO/RRP_HEUR604
No planned delivery time exists for product &1 in location &2
What causes this issue? The <DS:DE./SAPAPO/PLIFZ>planned delivery time</> has not been defined for product &V1& in location &...
Click on this link to search all SAP messages.