Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 195
Message text: Planning calendar or days' supply values are not correctly maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/RRP_HEUR195 indicates that there is an issue with the planning calendar or the days' supply values in the Advanced Planning and Optimization (APO) module. This error typically arises during the planning process when the system encounters inconsistencies or missing data related to the planning calendar or the days' supply settings.
Cause: Incorrect Planning Calendar: The planning calendar may not be correctly defined or assigned to the relevant planning object (e.g., product, location). Missing Days' Supply Values: The days' supply values for the product may not be maintained in the system, leading to issues during the planning run. Inconsistent Data: There may be inconsistencies in the master data related to the product or location, such as missing or incorrect entries in the product master or location master.
Configuration Issues: There could be configuration issues in the APO system that affect how the planning calendar and days' supply are set up.
Solution: Check Planning Calendar: Go
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_HEUR194 Safety days' supply greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2&, a safety days' supply that is greater than the shelf life of the prod...
/SAPAPO/RRP_HEUR193 Target days' supply greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2& a target days' supply that is greater than the shelf life of the produ...
/SAPAPO/RRP_HEUR196 The rate of the line is set to 0
What causes this issue? In the PPM or PDS of the product you have not defined a value for <LS>variable consumption</>.System Response Th...
/SAPAPO/RRP_HEUR200 There has possibly been a low-level code change for the model &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.