Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 193
Message text: Target days' supply greater than shelf life of product &1, location &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR193
- Target days' supply greater than shelf life of product &1, location &2 ?The SAP error message
/SAPAPO/RRP_HEUR193
indicates that the target days' supply for a product exceeds its shelf life at a specific location. This error typically arises in the context of Advanced Planning and Optimization (APO) when planning for inventory levels that are not feasible due to the product's shelf life constraints.Cause:
- Shelf Life Exceeded: The target days' supply calculated for the product is greater than its defined shelf life. This means that the system is trying to plan for more inventory than can be realistically held before it expires.
- Incorrect Configuration: The shelf life of the product may not be set correctly in the material master data.
- Planning Parameters: The planning parameters or heuristics used may not be aligned with the product's characteristics, leading to unrealistic supply targets.
Solution:
Review Shelf Life Settings:
- Check the material master data for the product in question. Ensure that the shelf life is correctly defined in the relevant views (e.g., Basic Data, MRP, or Storage).
- If the shelf life is too short for the planned supply, consider adjusting it if feasible.
Adjust Target Days' Supply:
- Review the planning strategy and heuristics being used. If the target days' supply is set too high, consider adjusting it to align with the product's shelf life.
- You may need to modify the planning parameters in the APO system to ensure that they are realistic and achievable.
Change Planning Heuristic:
- If the current heuristic is not suitable for the product, consider using a different planning heuristic that takes shelf life into account more effectively.
Inventory Management:
- Implement better inventory management practices to ensure that products are rotated and used within their shelf life. This may include using First Expired, First Out (FEFO) methods.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring shelf life and planning heuristics.
Related Information:
By addressing the underlying causes and adjusting the relevant settings, you can resolve the error and ensure that your planning processes are aligned with the product's shelf life constraints.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR192
Reorder days' supply greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2&, a reorder days' supply has been specified in the location product mas...
/SAPAPO/RRP_HEUR191
Period duration greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2&, a periodic lot size procedure has been specified in the location product m...
/SAPAPO/RRP_HEUR194
Safety days' supply greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2&, a safety days' supply that is greater than the shelf life of the prod...
/SAPAPO/RRP_HEUR195
Planning calendar or days' supply values are not correctly maintained
What causes this issue? In the product master, the value that you have entered for the <LS>target days' supply</> or for the <LS&...
Click on this link to search all SAP messages.