How To Fix /SAPAPO/RRP_HEUR193 - Target days' supply greater than shelf life of product &1, location &2


/SAPAPO/RRP_HEUR193 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 193

  • Message text: Target days' supply greater than shelf life of product &1, location &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/RRP_HEUR193 - Details

  • The SAP error message /SAPAPO/RRP_HEUR193 indicates that the target days' supply for a product exceeds its shelf life at a specific location. This error typically arises in the context of Advanced Planning and Optimization (APO) when planning for inventory levels that are not feasible due to the product's shelf life constraints.
    
    Cause: Shelf Life Exceeded: The target days' supply calculated for the product is greater than its defined shelf life. This means that the system is trying to plan for more inventory than can be realistically held before it expires. Incorrect Configuration: The shelf life of the product may not be set correctly in the material master data. Planning Parameters: The planning parameters or heuristics used may not be aligned with the product's characteristics, leading to unrealistic supply targets.
    Solution: Review Shelf Life Settings: Check the material master data for the product in question. Ensure that the shelf life is correctly defined in the relevant views (e.g.,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/RRP_HEUR193 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author