Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 191
Message text: Period duration greater than shelf life of product &1, location &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR191
- Period duration greater than shelf life of product &1, location &2 ?The SAP error message
/SAPAPO/RRP_HEUR191
indicates that the period duration specified for a planning operation exceeds the shelf life of the product at a specific location. This error typically arises in the context of Advanced Planning and Optimization (APO) when dealing with product availability and planning scenarios.Cause:
- Shelf Life Exceeded: The planning period you are trying to set is longer than the shelf life of the product. This means that the product will expire before the end of the planning period.
- Incorrect Configuration: The shelf life data for the product may not be correctly maintained in the system.
- Planning Parameters: The planning parameters or heuristics being used may not be appropriate for the product's characteristics.
Solution:
- Adjust Planning Period: Reduce the planning period duration to be within the shelf life of the product. This can be done in the planning settings or during the planning run.
- Review Shelf Life Data: Check the shelf life settings for the product in the material master. Ensure that the shelf life is correctly defined and reflects the actual shelf life of the product.
- Go to the material master (transaction
MM03
) and check the "Basic Data" and "Storage" views for shelf life information.- Modify Heuristic Settings: If you are using a specific heuristic for planning, review its settings to ensure it is appropriate for the product's shelf life.
- Consult Documentation: Review SAP documentation or help resources for specific heuristics and their requirements regarding shelf life and planning periods.
Related Information:
By addressing the above points, you should be able to resolve the error and ensure that your planning processes are aligned with the product's shelf life constraints.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR190
Reuse interval greater than shelf life of product &1, location &2
What causes this issue? In the heuristic parameters, you have specified a reuse interval that is greater than the shelf life of product &V1& ...
/SAPAPO/RRP_HEUR188
Product &1 in location &2 not covered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR192
Reorder days' supply greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2&, a reorder days' supply has been specified in the location product mas...
/SAPAPO/RRP_HEUR193
Target days' supply greater than shelf life of product &1, location &2
What causes this issue? For product &V1& in location &V2& a target days' supply that is greater than the shelf life of the produ...
Click on this link to search all SAP messages.