How To Fix /SAPAPO/RRP_HEUR196 - The rate of the line is set to 0


/SAPAPO/RRP_HEUR196 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 196

  • Message text: The rate of the line is set to 0

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_HEUR196 - The rate of the line is set to 0 ?
    The SAP error message /SAPAPO/RRP_HEUR196: The rate of the line is set to 0 typically occurs in the context of Advanced Planning and Optimization (APO) when running heuristics or planning runs. This error indicates that there is a problem with the rate of a production line or resource being set to zero, which prevents the planning process from proceeding correctly.
    
    Cause: Zero Rate Configuration: The production line or resource has been configured with a rate of zero. This could be due to incorrect settings in the master data or planning parameters. Resource Availability: The resource may not be available for production, leading to a zero rate being assigned. Incorrect Planning Data: There may be issues with the planning data, such as missing or incorrect entries in the resource or product master data. Capacity Constraints: If the resource is constrained or not available for the planned period, it may lead to a zero rate.
    Solution: Check Resource Master

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker