Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix /SAPAPO/RRP_HEUR175 - The strategy does not permit forward scheduling


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 175

  • Message text: The strategy does not permit forward scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_HEUR175 - The strategy does not permit forward scheduling ?

    The SAP error message /SAPAPO/RRP_HEUR175 indicates that the strategy you are using does not allow for forward scheduling in the context of the Advanced Planning and Optimization (APO) module. This error typically arises when you are trying to perform a planning operation that requires forward scheduling, but the current planning strategy settings do not permit it.

    Cause:

    1. Planning Strategy Configuration: The planning strategy assigned to the product or location may be configured to only allow backward scheduling. This is common in certain production environments where the focus is on meeting deadlines rather than starting production as early as possible.
    2. Product Master Data: The product master data may have settings that restrict forward scheduling, such as lead times or production constraints.
    3. Heuristic Settings: The heuristic you are using may not support forward scheduling due to its design or the specific parameters set for it.

    Solution:

    1. Check Planning Strategy: Review the planning strategy assigned to the product in the product master data. If it is set to a strategy that does not allow forward scheduling, consider changing it to one that does, if appropriate for your business process.
    2. Adjust Heuristic Parameters: If you are using a specific heuristic, check its parameters to see if there are options to allow forward scheduling. You may need to consult the documentation for the heuristic or work with your SAP consultant to adjust these settings.
    3. Review Product Master Data: Ensure that the lead times and other relevant settings in the product master data are configured correctly to allow for forward scheduling.
    4. Consult SAP Documentation: Refer to SAP documentation or help resources for more detailed information on the specific planning strategies and heuristics you are using.
    5. Testing: After making changes, run a test planning run to ensure that the error does not occur again and that the scheduling behaves as expected.

    Related Information:

    • SAP APO Documentation: Review the official SAP documentation for APO to understand the implications of different planning strategies and heuristics.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuring planning strategies and heuristics.

    By following these steps, you should be able to identify the cause of the error and implement a solution that allows for forward scheduling in your planning processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author