Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 171
Message text: Stragegy &1 does not permit forward scheduling
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR171
- Stragegy &1 does not permit forward scheduling ?The SAP error message /SAPAPO/RRP_HEUR171 indicates that the strategy you are using does not allow for forward scheduling in the context of Advanced Planning and Optimization (APO). This error typically arises when you are trying to perform a planning operation that requires forward scheduling, but the selected strategy is configured to only allow backward scheduling.
Cause: Strategy Configuration: The strategy you are using is set up in such a way that it does not permit forward scheduling. This could be due to the nature of the strategy itself, which may be designed for backward scheduling only. Planning Parameters: The planning parameters associated with the strategy may not be configured to allow forward scheduling. Product or Location Settings: The specific product or location settings may restrict the use of forward scheduling.
Solution: Check Strategy Settings: Go to the configuration of the strategy in SAP APO and verify if it allows forward scheduling. You may need to consult with
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_HEUR170
Strategy &1 does not permit forward scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR160
Cannot convert units of measure
What causes this issue? Two units that are necessary to calculate the <ZH><ZK>procurement costs </></> could not be converted...
/SAPAPO/RRP_HEUR172
An error occurred during the import of scheduling data
What causes this issue? The heuristic considers only completely scheduled orders and an error occured while reading the planning data.System Response...
/SAPAPO/RRP_HEUR173
Error occurred when reading order data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.