How To Fix /SAPAPO/RRP_HEUR170 - Strategy &1 does not permit forward scheduling


/SAPAPO/RRP_HEUR170 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 170

  • Message text: Strategy &1 does not permit forward scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/RRP_HEUR170 - Details

  • The SAP error message /SAPAPO/RRP_HEUR170 Strategy &1 does not permit forward scheduling typically occurs in the context of Advanced Planning and Optimization (APO) when you are trying to perform a forward scheduling operation using a strategy that does not allow it. This error is related to the planning strategies defined in the system, which dictate how production and procurement processes are managed.
    
    Cause: Planning Strategy Configuration: The planning strategy you are using (indicated by &1 in the error message) is configured in such a way that it does not support forward scheduling. This could be due to the nature of the strategy, which may be designed for backward scheduling or other specific scheduling methods. Product Master Data: The product master data may have settings that restrict forward scheduling based on the selected strategy. Resource Constraints: There may be constraints or settings in the resource or production process that prevent forward scheduling.
    Solution: Check Planning Strategy: Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/RRP_HEUR170 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant