Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 057
Message text: Operation end date reduced to end of planning horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC057
- Operation end date reduced to end of planning horizon ?The SAP error message /SAPAPO/RRP_CDOC057 indicates that the operation end date for a production order or a planned order has been reduced to the end of the planning horizon. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.
Cause: Planning Horizon Limitations: The planning horizon is defined in the system settings, and if the operation's end date exceeds this horizon, the system automatically adjusts it to the end of the planning horizon. Capacity Constraints: If there are capacity constraints or resource availability issues, the system may adjust the operation dates to fit within the available planning horizon. Order Scheduling: The scheduling of orders may be influenced by other orders or constraints in the system, leading to adjustments in the operation dates. Configuration Settings: Incorrect configuration settings in the planning parameters or master data can lead to this error.
Solution: Review Planning Horizon Settings: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_CDOC056
Operation start date increased to start of planning horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC055
Assembly scrap >= 100% is not permitted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC058
Too many operations of an order have been selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC059
The selected operations of an order are not suitable for order generation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.