How To Fix /SAPAPO/RRP_CDOC056 - Operation start date increased to start of planning horizon


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_CDOC -

  • Message number: 056

  • Message text: Operation start date increased to start of planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_CDOC056 - Operation start date increased to start of planning horizon ?

    The SAP error message /SAPAPO/RRP_CDOC056 indicates that the operation start date for a production order or a planned order has been adjusted to the start of the planning horizon. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.

    Cause:

    1. Planning Horizon Settings: The planning horizon in SAP APO defines the time frame within which planning activities are performed. If the operation's start date falls outside this horizon, the system automatically adjusts it to the beginning of the planning horizon.
    2. Order Dates: The dates associated with the production or planned order may have been set incorrectly, leading to a situation where the start date is not feasible within the defined planning horizon.
    3. Capacity Constraints: If there are capacity constraints or resource availability issues, the system may adjust the start date to ensure that the operation can be scheduled within the available capacity.
    4. Changes in Demand or Supply: Changes in demand or supply that affect the scheduling of operations can also lead to this error, as the system tries to optimize the planning process.

    Solution:

    1. Review Planning Horizon: Check the planning horizon settings in the APO system. Ensure that it is set appropriately for your planning needs. You may need to extend the planning horizon if necessary.
    2. Adjust Order Dates: Review the dates associated with the production or planned order. Make sure that the start date is within the planning horizon. If necessary, adjust the order dates to align with the planning horizon.
    3. Check Capacity Availability: Analyze the capacity of the resources involved in the operation. If there are capacity constraints, consider adjusting the production schedule or reallocating resources to ensure that the operation can be scheduled correctly.
    4. Re-run Planning: After making the necessary adjustments, re-run the planning process to see if the issue is resolved. This may involve running the heuristic or optimizer again to generate a new schedule.
    5. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on planning horizons and scheduling in APO.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/RRP for the interactive planning board.
    • APO Configuration: Understanding the configuration settings for planning horizons, production scheduling profiles, and resource planning can help prevent similar issues in the future.
    • User Exits and BAdIs: If custom logic is implemented in your APO system, check for any user exits or Business Add-Ins (BAdIs) that might affect the scheduling logic.

    By addressing the underlying causes and following the suggested solutions, you should be able to resolve the error message and ensure that your production planning processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant