How To Fix /SAPAPO/RRP_CDOC056 - Operation start date increased to start of planning horizon


/SAPAPO/RRP_CDOC056 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_CDOC -

  • Message number: 056

  • Message text: Operation start date increased to start of planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/RRP_CDOC056 - Details

  • The SAP error message /SAPAPO/RRP_CDOC056 indicates that the operation start date for a production order or a planned order has been adjusted to the start of the planning horizon. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.
    
    Cause: Planning Horizon Settings: The planning horizon in SAP APO defines the time frame within which planning activities are performed. If the operation's start date falls outside this horizon, the system automatically adjusts it to the beginning of the planning horizon. Order Dates: The dates associated with the production or planned order may have been set incorrectly, leading to a situation where the start date is not feasible within the defined planning horizon. Capacity Constraints: If there are capacity constraints or resource availability issues, the system may adjust the start date to ensure that the operation can be scheduled within the available capacity. Changes

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/RRP_CDOC056 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker