Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 704
Message text: Only start date is known; forward scheduling is not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP704
- Only start date is known; forward scheduling is not possible ?The SAP error message
/SAPAPO/RRP704 Only start date is known; forward scheduling is not possible
typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to perform forward scheduling due to insufficient information about the production process or the planning parameters.Cause:
- Missing End Date: The system requires both a start date and an end date to perform forward scheduling. If only the start date is provided, the system cannot determine the duration of the process.
- Incomplete Master Data: The master data for the product or resource may be incomplete, lacking necessary information such as lead times, production times, or capacity.
- Planning Parameters: The planning parameters for the product or resource may not be set correctly, leading to the inability to calculate the scheduling.
- Resource Availability: If the resources required for production are not available or not defined properly, the system cannot schedule the production forward.
Solution:
- Check and Update Master Data: Ensure that all relevant master data (e.g., material master, resource master) is complete and accurate. This includes lead times, production times, and any other relevant parameters.
- Define End Date: If possible, provide an end date for the scheduling. This can sometimes be done by adjusting the planning parameters or the production process.
- Review Planning Parameters: Check the planning parameters for the product and resource in the APO system. Ensure that they are set correctly to allow for forward scheduling.
- Resource Availability: Verify that the resources required for production are available and properly defined in the system. This includes checking for any maintenance or downtime that may affect scheduling.
- Use Backward Scheduling: If forward scheduling is not possible, consider using backward scheduling if it fits the planning scenario.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RRP4
(Resource View) to analyze the planning situation.By addressing the underlying causes and ensuring that all necessary data is available, you should be able to resolve the error and enable forward scheduling in your SAP APO environment.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP703
Reqmnts outside production horizon of product &1 location &2 version &3
What causes this issue? A requirement is after the end of the production horizon. However, PP/DS only considers requirements that are before the end ...
/SAPAPO/RRP702
Product &1 in location &2 planning verison &3 not planned automatically
What causes this issue? The product is not automtically planned immediately. This is, however, a prerequisite for the multi-level ATP check. If the q...
/SAPAPO/RRP705
More than &2 receipt elements should be created for product &1
What causes this issue? There are many demands for the product. In the lot size screen of the product master, a small fixed lot size or a small maxim...
/SAPAPO/RRP706
Procurement type &1 not possible for product &2 location &3
What causes this issue? The product should be used in a process that requires a specific type of procurement. Thus, for subcontracting in APO, it is ...
Click on this link to search all SAP messages.