Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 703
Message text: Reqmnts outside production horizon of product &1 location &2 version &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP703
- Reqmnts outside production horizon of product &1 location &2 version &3 ?The SAP error message
/SAPAPO/RRP703
indicates that there are requirements for a product that fall outside the defined production horizon for a specific location and version. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, where planning horizons are set to manage production and inventory effectively.Cause:
- Production Horizon Settings: The production horizon is defined in the system and specifies the time frame within which production planning can be performed. If a requirement (like a sales order or forecast) is scheduled for a date that is beyond this horizon, the system will generate this error.
- Incorrect Planning Parameters: The planning parameters for the product or location may not be set correctly, leading to requirements being generated outside the expected time frame.
- Data Entry Errors: There may be incorrect data entries in the sales orders, forecasts, or other demand sources that lead to requirements being created for dates outside the production horizon.
Solution:
Adjust Production Horizon: Review and, if necessary, extend the production horizon for the product and location in the APO system. This can be done in the configuration settings for the product or location.
- Navigate to the relevant configuration settings in SAP APO and adjust the production horizon parameters.
Review Requirements: Check the requirements that are causing the error. If they are indeed valid but just outside the horizon, consider whether they need to be adjusted or if the horizon should be extended.
- Use transaction codes like
/SAPAPO/RRP3
to analyze the requirements and their dates.Correct Data Entries: Ensure that all data entries related to sales orders, forecasts, and other demand sources are accurate and within the expected time frame.
- Validate the dates and quantities in the relevant documents.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing production horizons and requirements in APO.
Related Information:
/SAPAPO/RRP3
(Product View) and /SAPAPO/RRP4
(Location View), to analyze and manage requirements.By following these steps, you should be able to resolve the error and ensure that your planning processes in SAP APO function smoothly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP702
Product &1 in location &2 planning verison &3 not planned automatically
What causes this issue? The product is not automtically planned immediately. This is, however, a prerequisite for the multi-level ATP check. If the q...
/SAPAPO/RRP701
Planning version does not allow automatic planning
What causes this issue? Automatic PP/DS planning is not activated in the planning version. This is, however, a prerequisite for the multi-level ATP c...
/SAPAPO/RRP704
Only start date is known; forward scheduling is not possible
What causes this issue? An order is to be created from which only the start date is known. The order, therefore, has to be scheduled forwards from th...
/SAPAPO/RRP705
More than &2 receipt elements should be created for product &1
What causes this issue? There are many demands for the product. In the lot size screen of the product master, a small fixed lot size or a small maxim...
Click on this link to search all SAP messages.