Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 455
Message text: The system terminated construction of pegging structure after &1 node(s)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP455
- The system terminated construction of pegging structure after &1 node(s) ?The SAP error message
/SAPAPO/RRP455
indicates that the system has terminated the construction of the pegging structure after a certain number of nodes (indicated by&1
). This error typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to complete the pegging process due to various reasons.Causes:
- Excessive Complexity: The pegging structure may be too complex, with too many nodes or relationships, leading to performance issues or timeouts.
- Data Issues: There may be inconsistencies or errors in the master data or transaction data that prevent the system from correctly establishing the pegging relationships.
- Configuration Limits: The system may have configuration limits that restrict the number of nodes that can be processed in a single pegging operation.
- Performance Issues: The system may be experiencing performance issues due to high load or insufficient resources, causing it to terminate the process prematurely.
Solutions:
- Simplify the Pegging Structure: Review the planning data and try to simplify the pegging structure. This may involve reducing the number of nodes or relationships being processed at one time.
- Check Master Data: Ensure that all relevant master data (e.g., materials, resources, and production versions) is correctly maintained and free of inconsistencies.
- Adjust Configuration Settings: If applicable, check the configuration settings related to pegging and see if there are any limits that can be adjusted to allow for more nodes.
- Increase System Resources: If performance is an issue, consider increasing the system resources (CPU, memory) or optimizing the system performance.
- Review Logs and Traces: Check the system logs and traces for any additional error messages or warnings that may provide more context about the issue.
- Consult SAP Notes: Look for relevant SAP Notes that may address this specific error or provide patches or updates that could resolve the issue.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP454
Order &1: Activity on resource &2 was shifted to date &3 time &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP453
Pegging relationship from receipt &1 to requirement &2 causes cycle
What causes this issue? You want to execute one of the following actions for an order with the output product &V3& in the location &V4&am...
/SAPAPO/RRP456
Planned independent requirement for &1 in &2 cannot be created
What causes this issue? You tried to create a planned independent requirement for product &v1& in location &v2& in a planning segment...
/SAPAPO/RRP457
&1 created with delay on &2 &3
What causes this issue? The system created the order too late. Either the components or resources were not available in time or the total lead time w...
Click on this link to search all SAP messages.