Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 457
Message text: &1 created with delay on &2 &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP457
- &1 created with delay on &2 &3 ?The SAP error message /SAPAPO/RRP457 &1 created with delay on &2 &3 typically relates to issues in the Advanced Planning and Optimization (APO) module, specifically in the context of the production planning and detailed scheduling processes. This error indicates that a certain operation or order was created with a delay, which can affect the overall planning and scheduling processes.
Cause: Resource Constraints: The delay may be due to resource constraints, such as insufficient capacity or availability of materials. Scheduling Conflicts: Conflicts in scheduling, such as overlapping orders or operations that cannot be executed simultaneously. Master Data Issues: Incorrect or incomplete master data (e.g., production versions, routing, or work center data) can lead to delays in order creation. System Performance: Performance issues in the SAP system, such as slow processing times or system downtimes, can also contribute to delays.
Configuration Issues: Incorrect configuration settings in the APO system can lead to unexpected behavior during planning and scheduling.
Solution: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP456
Planned independent requirement for &1 in &2 cannot be created
What causes this issue? You tried to create a planned independent requirement for product &v1& in location &v2& in a planning segment...
/SAPAPO/RRP455
The system terminated construction of pegging structure after &1 node(s)
What causes this issue? The maximum number of &V1& input/output nodes was exceeded during the construction of the pegging structure in the co...
/SAPAPO/RRP480
********************* Interface Errors **********************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP481
Application for planned order &1 changed by BAdI from initial to SNP
What causes this issue? In SAP R/3, you can set the indicator <LS>Create planned orders as SNP planned orders</> when activating an integ...
Click on this link to search all SAP messages.