Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 454
Message text: Order &1: Activity on resource &2 was shifted to date &3 time &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP454
- Order &1: Activity on resource &2 was shifted to date &3 time &4 ?The SAP error message
/SAPAPO/RRP454
indicates that an order's activity on a specific resource has been shifted to a different date and time. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.Cause:
The error message can be triggered by several factors, including:
Resource Availability: The resource (e.g., machine, labor) may not be available at the originally scheduled time due to maintenance, breakdowns, or other scheduling conflicts.
Capacity Constraints: The resource may be overbooked, leading to a need to reschedule activities to ensure that capacity is not exceeded.
Changes in Demand: Changes in demand or order priorities can lead to a need to adjust the scheduling of activities.
Scheduling Parameters: The settings in the planning run, such as lead times, setup times, or other scheduling parameters, may cause the system to shift the activity.
Order Dependencies: Dependencies between orders (e.g., predecessor-successor relationships) may require the system to adjust the timing of activities.
Solution:
To resolve this error, consider the following steps:
Check Resource Availability: Verify the availability of the resource at the originally scheduled time. If the resource is not available, you may need to adjust the schedule or allocate a different resource.
Review Capacity Planning: Analyze the capacity of the resource to ensure that it is not overbooked. You may need to adjust the production schedule or redistribute workloads.
Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the APO system to ensure they align with your production requirements.
Analyze Order Dependencies: Check for any dependencies between orders that may be causing the shift. Adjust the order sequence if necessary.
Re-run the Planning Process: After making the necessary adjustments, re-run the planning process to see if the issue is resolved.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to your version of SAP APO.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RRP4
(Order View) to analyze the orders and resources involved.By following these steps, you should be able to identify the root cause of the error and implement a solution to prevent it from occurring in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP453
Pegging relationship from receipt &1 to requirement &2 causes cycle
What causes this issue? You want to execute one of the following actions for an order with the output product &V3& in the location &V4&am...
/SAPAPO/RRP452
Priority of order &1 has been changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP455
The system terminated construction of pegging structure after &1 node(s)
What causes this issue? The maximum number of &V1& input/output nodes was exceeded during the construction of the pegging structure in the co...
/SAPAPO/RRP456
Planned independent requirement for &1 in &2 cannot be created
What causes this issue? You tried to create a planned independent requirement for product &v1& in location &v2& in a planning segment...
Click on this link to search all SAP messages.