Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 514
Message text: Primary resource capa. consumptions of rel. &1 &2 - &3 &4 are different
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN514
- Primary resource capa. consumptions of rel. &1 &2 - &3 &4 are different ?The SAP error message
/SAPAPO/PPM_MAINTAIN514
indicates that there is a discrepancy in the primary resource capacity consumptions for a specific relationship in the Advanced Planning and Optimization (APO) module. This error typically arises when the capacity consumption values for a primary resource in a production process do not match the expected values.Cause:
The error can be caused by several factors, including:
- Inconsistent Data: The capacity consumption data for the primary resource may have been altered or not updated correctly in the system.
- Configuration Issues: There may be configuration issues in the APO system that lead to mismatches in the expected and actual capacity consumption.
- Master Data Issues: Problems with master data, such as incorrect resource definitions or relationships, can lead to discrepancies.
- Planning Version Differences: If different planning versions are being used, the capacity consumption values may differ between them.
Solution:
To resolve this error, you can take the following steps:
- Check Resource Configuration: Verify the configuration of the primary resource in the APO system. Ensure that the capacity consumption settings are correctly defined.
- Review Master Data: Check the master data for the resources involved. Ensure that the relationships and capacity consumption values are consistent and correctly maintained.
- Analyze Planning Versions: If you are using multiple planning versions, ensure that the capacity consumption values are aligned across these versions.
- Recalculate Capacity: If necessary, recalculate the capacity for the affected resources to ensure that the values are updated and consistent.
- Consult Logs: Check the system logs for any additional error messages or warnings that may provide more context about the issue.
- SAP Notes: Look for any relevant SAP Notes or documentation that may address this specific error message or provide guidance on troubleshooting.
Related Information:
/SAPAPO/PPM
for production planning and /SAPAPO/RES
for resource management to investigate and resolve the issue.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN513
Res. &1 cannot be used in relationships with a cover flag (see long text)
What causes this issue? Only resource types SINGLE or MULTI can be used in activity relationships with cover flags.System Response The system issues...
/SAPAPO/PPM_MAINTAIN512
The primary resource between activities &1 &2 and &3 &4 must be the same
What causes this issue? Primary resource linking has been used in the activity relationship specified, but there is a mode in one of the activities w...
/SAPAPO/PPM_MAINTAIN515
Mode names in relationship &1 &2 - &3 &4 are different
What causes this issue? Mode linkage is used in the activity relationships specified, but the mode names in the activities are not identical.System R...
/SAPAPO/PPM_MAINTAIN516
Plan contains more than one operation with bottleneck resource
What causes this issue? The plan contains more than one operation (PI --> production operation or phase) with a bottleneck resourceSystem Response...
Click on this link to search all SAP messages.