Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 516
Message text: Plan contains more than one operation with bottleneck resource
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN516
- Plan contains more than one operation with bottleneck resource ?The SAP error message
/SAPAPO/PPM_MAINTAIN516
indicates that a planning operation in the Advanced Planning and Optimization (APO) module contains more than one operation that is assigned to a bottleneck resource. This situation can arise during the planning process when multiple operations are competing for the same limited resource, which can lead to inefficiencies in production scheduling.Cause:
- Resource Constraints: The bottleneck resource is a limited resource that cannot meet the demand from multiple operations simultaneously.
- Planning Configuration: The planning setup may not have been configured correctly, leading to multiple operations being assigned to the same bottleneck resource.
- Production Orders: There may be overlapping production orders that require the same resource at the same time.
- Capacity Planning: The capacity of the bottleneck resource may not be sufficient to handle the planned operations.
Solution:
- Review Resource Allocation: Check the resource allocation for the operations in question. Ensure that the operations are scheduled in a way that does not exceed the capacity of the bottleneck resource.
- Adjust Production Schedule: Modify the production schedule to stagger the operations that require the bottleneck resource. This may involve rescheduling some operations to different time slots.
- Increase Resource Capacity: If feasible, consider increasing the capacity of the bottleneck resource, either by adding more resources or by optimizing the existing ones.
- Use Alternative Resources: If possible, assign some operations to alternative resources that can handle the workload, thereby relieving pressure on the bottleneck resource.
- Check Planning Parameters: Review the planning parameters and settings in the APO system to ensure they are configured correctly for your production environment.
- Run Capacity Planning: Execute a capacity planning run to identify and resolve any capacity issues before finalizing the production plan.
Related Information:
By addressing the underlying causes of the bottleneck and implementing the suggested solutions, you can resolve the error and improve the efficiency of your production planning process.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN515
Mode names in relationship &1 &2 - &3 &4 are different
What causes this issue? Mode linkage is used in the activity relationships specified, but the mode names in the activities are not identical.System R...
/SAPAPO/PPM_MAINTAIN514
Primary resource capa. consumptions of rel. &1 &2 - &3 &4 are different
What causes this issue? The capacity consumptions of the primary resources in the activities of the relationship specified are different. This is not...
/SAPAPO/PPM_MAINTAIN517
Activity network is not complete
What causes this issue? The activity network does not include all activities of the PPM.System Response The system issues an error message and will ...
/SAPAPO/PPM_MAINTAIN518
Activity &1 &2 is its own successor
What causes this issue? A relationship has been created for the activity specified. The relationship refers to itself. This is not allowed.System Res...