Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 513
Message text: Res. &1 cannot be used in relationships with a cover flag (see long text)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN513
- Res. &1 cannot be used in relationships with a cover flag (see long text) ?The SAP error message /SAPAPO/PPM_MAINTAIN513 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling. The error message indicates that a specific resource (denoted as &1 in the message) cannot be used in relationships that have a cover flag set.
Cause: The error is generally caused by one of the following reasons: Resource Configuration: The resource in question may not be configured to support relationships with a cover flag. This could be due to settings in the resource master data or the way the resource is defined in the system. Cover Flag Usage: The cover flag is used to indicate that a resource can cover another resource's capacity. If the resource does not have the necessary attributes or settings to allow for this type of relationship, the error will be triggered. Incompatibility: The resource may be incompatible with the specific planning scenario or the type
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PPM_MAINTAIN512
The primary resource between activities &1 &2 and &3 &4 must be the same
What causes this issue? Primary resource linking has been used in the activity relationship specified, but there is a mode in one of the activities w...
/SAPAPO/PPM_MAINTAIN511
Activities within operation &1 can only be linked using type end-start
What causes this issue? Within an operation, the activities can only be linked using relationship type "end-start".System Response The sys...
/SAPAPO/PPM_MAINTAIN514
Primary resource capa. consumptions of rel. &1 &2 - &3 &4 are different
What causes this issue? The capacity consumptions of the primary resources in the activities of the relationship specified are different. This is not...
/SAPAPO/PPM_MAINTAIN515
Mode names in relationship &1 &2 - &3 &4 are different
What causes this issue? Mode linkage is used in the activity relationships specified, but the mode names in the activities are not identical.System R...
Click on this link to search all SAP messages.