Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 511
Message text: Activities within operation &1 can only be linked using type end-start
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN511
- Activities within operation &1 can only be linked using type end-start ?The SAP error message /SAPAPO/PPM_MAINTAIN511 indicates that there is an issue with the way activities within an operation are linked in the Production Planning and Detailed Scheduling (PP/DS) module of SAP Advanced Planning and Optimization (APO). Specifically, the error states that activities can only be linked using the "end-start" relationship.
Cause: This error typically arises when: Incorrect Linkage Type: You are trying to link activities using a relationship type that is not allowed. In this case, the system expects an "end-start" relationship, which means that the end of one activity must precede the start of another. Activity Configuration: The configuration of the activities may not be set up correctly to allow for the desired linkage. Data Integrity Issues: There may be inconsistencies or errors in the data related to the activities or operations.
Solution: To resolve this error, you can take the following steps: Check Activity Linkages: Review the activities within the operation and ensure that they are linked
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PPM_MAINTAIN510
The activities in operation &1 were no linked in a linear form
What causes this issue? Some activities in the operation were networked in parallel. This is not allowed.System Response The system issues an error ...
/SAPAPO/PPM_MAINTAIN509
An internal material flow has been modeled for the product &1
What causes this issue? The product is both produced by this PPM and is used in another activity. This type of modeling is generally known as "I...
/SAPAPO/PPM_MAINTAIN512
The primary resource between activities &1 &2 and &3 &4 must be the same
What causes this issue? Primary resource linking has been used in the activity relationship specified, but there is a mode in one of the activities w...
/SAPAPO/PPM_MAINTAIN513
Res. &1 cannot be used in relationships with a cover flag (see long text)
What causes this issue? Only resource types SINGLE or MULTI can be used in activity relationships with cover flags.System Response The system issues...