How To Fix /SAPAPO/PPM_MAINTAIN511 - Activities within operation &1 can only be linked using type end-start


/SAPAPO/PPM_MAINTAIN511 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PPM_MAINTAIN -

  • Message number: 511

  • Message text: Activities within operation &1 can only be linked using type end-start

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPM_MAINTAIN511 - Activities within operation &1 can only be linked using type end-start ?
    The SAP error message /SAPAPO/PPM_MAINTAIN511 indicates that there is an issue with the way activities within an operation are linked in the Production Planning and Detailed Scheduling (PP/DS) module of SAP Advanced Planning and Optimization (APO). Specifically, the error states that activities can only be linked using the "end-start" relationship.
    
    Cause: This error typically arises when: Incorrect Linkage Type: You are trying to link activities using a relationship type that is not allowed. In this case, the system expects an "end-start" relationship, which means that the end of one activity must precede the start of another. Activity Configuration: The configuration of the activities may not be set up correctly to allow for the desired linkage. Data Integrity Issues: There may be inconsistencies or errors in the data related to the activities or operations.
    Solution: To resolve this error, you can take the following steps: Check Activity Linkages: Review the activities within the operation and ensure that they are linked

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author