Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 114
Message text: Transportation lane &1: Discrete number of vehicles not considered
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER114
- Transportation lane &1: Discrete number of vehicles not considered ?The SAP error message
/SAPAPO/PP_OPTIMIZER114
indicates that there is an issue with the transportation lane configuration in the Advanced Planning and Optimization (APO) module, specifically related to the discrete number of vehicles not being considered for transportation planning.Cause:
This error typically arises when:
- Transportation Lane Configuration: The transportation lane is not properly configured to account for the discrete number of vehicles available for transportation. This could mean that the system is unable to determine how many vehicles can be used for a specific transportation lane.
- Vehicle Capacity: The vehicle capacity settings may not be defined correctly, or there may be no vehicles assigned to the transportation lane.
- Planning Parameters: The planning parameters for the optimizer may not be set to consider the discrete number of vehicles, leading to this error during the optimization process.
Solution:
To resolve this error, you can take the following steps:
Check Transportation Lane Configuration:
- Go to the transaction code
/SAPAPO/TS
(Transportation Lane) and verify the configuration of the transportation lane in question.- Ensure that the lane has been set up correctly with the appropriate source and destination locations.
Define Vehicle Capacity:
- Ensure that the vehicles assigned to the transportation lane have defined capacities. You can check this in the vehicle master data.
- Go to the transaction code
/SAPAPO/VEHICLE
to review and update vehicle details.Review Planning Parameters:
- Check the planning parameters in the optimizer profile to ensure that the discrete number of vehicles is being considered.
- You can do this by navigating to the optimizer profile settings in the APO system.
Run the Optimizer Again:
- After making the necessary adjustments, run the optimizer again to see if the error persists.
Consult Documentation:
- Review SAP documentation or notes related to transportation lane configuration and vehicle capacity to ensure compliance with best practices.
Contact SAP Support:
- If the issue persists after checking the above configurations, consider reaching out to SAP support for further assistance.
Related Information:
/SAPAPO/TS
: Transportation Lane/SAPAPO/VEHICLE
: Vehicle Master DataBy following these steps, you should be able to identify and resolve the issue related to the error message /SAPAPO/PP_OPTIMIZER114
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER113
Transportation lane &1, product &2: Minimum transportn lot not considered
What causes this issue? A minimum transportation lot size of &V3& was specified for product &V2& in transportation lane &V1&....
/SAPAPO/PP_OPTIMIZER112
Resource &1: Discrete increase not considered
What causes this issue? The increase for resource &V1& was permitted only in discrete (integer) steps (for example, increase only by 0 or 1, ...
/SAPAPO/PP_OPTIMIZER115
Production process model/PDS &1: Discrete lot size not considered
What causes this issue? Production in discrete (integer-based) lot sizes was chosen for production process model &V1& at location &V2&...
/SAPAPO/PP_OPTIMIZER116
Production process model/PDS &1: Minimum production lot not considered
What causes this issue? A minimum production lot size (&V3&) was set for production process model &V1& at location &V2&. This...
Click on this link to search all SAP messages.