Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 112
Message text: Resource &1: Discrete increase not considered
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER112
- Resource &1: Discrete increase not considered ?The SAP error message
/SAPAPO/PP_OPTIMIZER112 Resource &1: Discrete increase not considered
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with production planning and scheduling. This error indicates that the optimizer has encountered a situation where a resource (e.g., a machine or production line) has a discrete increase in capacity that is not being considered in the planning process.Cause:
- Discrete Capacity Changes: The resource in question has a capacity that can only be increased in discrete steps (e.g., a machine can only be upgraded to a higher capacity in specific increments), and the optimizer is not configured to account for these discrete changes.
- Resource Configuration: The resource may not be properly configured in the system to allow for discrete capacity increases.
- Planning Strategy: The planning strategy being used may not support the consideration of discrete capacity changes.
- Data Inconsistencies: There may be inconsistencies or missing data in the resource master data or in the planning book.
Solution:
- Check Resource Configuration: Review the configuration of the resource in the SAP system. Ensure that the resource is set up to allow for discrete capacity increases. This may involve checking the resource master data and ensuring that the capacity settings are correct.
- Adjust Planning Strategy: If the current planning strategy does not support discrete increases, consider changing the strategy to one that does. This may involve consulting with your planning team to determine the best approach.
- Review Capacity Planning Settings: Check the settings in the capacity planning area to ensure that discrete increases are enabled and properly configured.
- Update Master Data: Ensure that all relevant master data for the resource is complete and accurate. This includes checking for any missing or incorrect entries that could affect capacity calculations.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
- Testing: After making changes, run a test planning run to see if the error persists. Monitor the results to ensure that the optimizer is now considering the discrete increases.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER111
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& cannot be executed because there is not enough capacity in any bucket to cover the fixe...
/SAPAPO/PP_OPTIMIZER109
Transportable product &1: Not assigned to location
What causes this issue? Product &V1& can be transported over transportation lane &V2&, but it is not assigned to its location &V3...
/SAPAPO/PP_OPTIMIZER113
Transportation lane &1, product &2: Minimum transportn lot not considered
What causes this issue? A minimum transportation lot size of &V3& was specified for product &V2& in transportation lane &V1&....
/SAPAPO/PP_OPTIMIZER114
Transportation lane &1: Discrete number of vehicles not considered
What causes this issue? The number of vehicles was defined as discrete (integer-based) in transportation lane &V1&. This cannot be taken into...
Click on this link to search all SAP messages.