Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 111
Message text: Production process model/PDS &1: Cannot be executed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER111
- Production process model/PDS &1: Cannot be executed ?The SAP error message
/SAPAPO/PP_OPTIMIZER111
indicates that there is an issue with the Production Process Model (PDS) in the Advanced Planning and Optimization (APO) module. This error typically arises when the system cannot execute the PDS for a specific product or production process due to various reasons.Causes:
- Missing or Incomplete PDS: The PDS for the specified product may not be created or may be incomplete.
- Incorrect Configuration: There may be configuration issues in the PDS, such as missing operations, resources, or sequences.
- Resource Availability: The resources required for the production process may not be available or may be incorrectly defined.
- Invalid Product Data: The product master data may have inconsistencies or missing information.
- Planning Version Issues: The planning version being used may not be correctly set up or may not include the necessary data.
- Locking Issues: The PDS might be locked by another process or user, preventing execution.
Solutions:
- Check PDS Configuration: Verify that the PDS for the product is correctly configured. Ensure that all necessary operations, resources, and sequences are defined.
- Create or Update PDS: If the PDS is missing, create it using transaction
/SAPAPO/PDS
or update it if it is incomplete.- Validate Product Master Data: Check the product master data for any inconsistencies or missing information. Ensure that all required fields are filled out correctly.
- Resource Availability: Ensure that the resources required for the production process are available and correctly defined in the system.
- Check Planning Version: Make sure that the planning version you are using is correctly set up and includes the necessary data for the PDS.
- Release Locks: If the PDS is locked, check for any active sessions or processes that may be holding the lock and release it if necessary.
Related Information:
/SAPAPO/PDS
, /SAPAPO/OPTIMIZER
, and /SAPAPO/MC
to manage and troubleshoot PDS and optimization issues.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER109
Transportable product &1: Not assigned to location
What causes this issue? Product &V1& can be transported over transportation lane &V2&, but it is not assigned to its location &V3...
/SAPAPO/PP_OPTIMIZER100
Product &2: Invalid opening stock
What causes this issue? Storage resource of location &V1&, product &V2&: Opening stock &V3& is greater than the maximum possi...
/SAPAPO/PP_OPTIMIZER112
Resource &1: Discrete increase not considered
What causes this issue? The increase for resource &V1& was permitted only in discrete (integer) steps (for example, increase only by 0 or 1, ...
/SAPAPO/PP_OPTIMIZER113
Transportation lane &1, product &2: Minimum transportn lot not considered
What causes this issue? A minimum transportation lot size of &V3& was specified for product &V2& in transportation lane &V1&....
Click on this link to search all SAP messages.