Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP -
Message number: 631
Message text: SA line(s) restored from past due Release line(s). Sched.Agr: &1/&2.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP631
- SA line(s) restored from past due Release line(s). Sched.Agr: &1/&2. ?The SAP error message
/SAPAPO/PDRP631
indicates that there are issues with the scheduling agreement lines in the context of the Advanced Planning and Optimization (APO) module. Specifically, this message means that the system has restored supply lines from past due release lines for a scheduling agreement. This typically occurs in the context of demand planning and supply chain management.Cause:
Past Due Release Lines: The error is triggered when the system identifies that there are past due release lines in the scheduling agreement that need to be addressed. This can happen if the planned delivery dates of the release lines have already passed, and the system is trying to reconcile or adjust the supply accordingly.
Scheduling Agreement Issues: There may be inconsistencies or issues with the scheduling agreement itself, such as incorrect dates, quantities, or other parameters that lead to the system needing to restore past due lines.
Planning Parameters: The planning parameters set in the APO system may not align with the actual supply chain processes, leading to discrepancies in the scheduling agreement.
Solution:
Review Scheduling Agreement: Check the scheduling agreement referenced in the error message (indicated by &1/&2). Ensure that the release lines are correctly defined, and that there are no past due lines that need to be addressed.
Adjust Release Dates: If there are past due release lines, consider adjusting the release dates or quantities to align with the current planning requirements.
Check Planning Parameters: Review the planning parameters in the APO system to ensure they are set correctly. This includes checking the planning horizon, lead times, and other relevant settings.
Reprocess Planning Runs: After making necessary adjustments, reprocess the planning runs to see if the error persists. This may involve running the heuristic or optimizer again to generate new supply plans.
Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional insights or updates that may address the issue.
Engage SAP Support: If the issue continues to persist after taking the above steps, consider reaching out to SAP support for further assistance. They may provide patches or additional guidance based on the specific configuration of your system.
Related Information:
/SAPAPO/SDP94
for demand planning or /SAPAPO/MC90
for planning book configuration.By addressing the underlying causes and following the suggested solutions, you should be able to resolve the error message and ensure smoother operations within your SAP APO environment.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP630
Freeze hor. &1 is equal/longer than planning hor. &2 at loc. &3 prod. &4
What causes this issue? The freeze horizon is equal or longer than the planning horizon. This will cause that no planning is done for the given prod...
/SAPAPO/PDRP624
Manual freeze horizon &1 (location &2, product &3)
What causes this issue? <ZH>Manual Freeze Horizon</> When the system determines the freeze horizon, it will take the latest of the follow...
/SAPAPO/PDRP632
DRP has changed qty. of receipt with past ship date. Doc.No: &1/&2/&3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP633
DRP Input: Open quantity &1 on the release statistical line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.