How To Fix /SAPAPO/PAGT_HEUR027 - Order &1 successfully reexploded using PPM/PDS &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 027

  • Message text: Order &1 successfully reexploded using PPM/PDS &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PAGT_HEUR027 - Order &1 successfully reexploded using PPM/PDS &2 ?

    The SAP error message /SAPAPO/PAGT_HEUR027 indicates that an order has been successfully re-exploded using a Production Planning Master Data (PPM) or a Production Data Structure (PDS). This message is typically informational rather than an error, meaning that it is not indicating a problem but rather providing feedback on the processing of an order in the Advanced Planning and Optimization (APO) module.

    Cause:

    The message is triggered during the planning process when the system re-explodes a production order or a planned order. This re-explosion occurs when the system needs to break down the order into its components based on the PPM or PDS. This is a normal part of the planning process, especially when there are changes in demand, capacity, or other planning parameters.

    Solution:

    Since this message is informational, there is typically no action required unless it is accompanied by other error messages or issues. However, if you are seeing this message frequently and it is causing concern, consider the following steps:

    1. Review the Planning Run: Check the planning run logs to ensure that the re-explosion is occurring as expected and that there are no underlying issues with the PPM or PDS.

    2. Check PPM/PDS Configuration: Ensure that the PPM and PDS are correctly configured and that all necessary components and resources are defined properly.

    3. Monitor Order Processing: Keep an eye on the orders being processed to ensure that they are being planned and executed correctly.

    4. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on the specific planning heuristics being used.

    5. Engage with SAP Support: If you believe there is an underlying issue or if the message is causing disruptions in your planning process, consider reaching out to SAP support for further assistance.

    Related Information:

    • PPM (Production Planning Master Data): This is a master data object in SAP APO that defines how a product is produced, including the components required and the production process.
    • PDS (Production Data Structure): This is a more advanced structure that combines the features of PPM and includes additional details such as alternative resources and production versions.
    • Heuristics in SAP APO: Heuristics are algorithms used in SAP APO to perform planning tasks. Understanding the specific heuristics being used can help in troubleshooting and optimizing planning processes.

    In summary, the message /SAPAPO/PAGT_HEUR027 is generally not a cause for concern, but it is important to ensure that your planning processes are functioning as intended.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker