Message type: E = Error
Message class: /SAPAPO/PAGT_HEUR -
Message number: 024
Message text: Maximum number of periods backwards reached; finite scheduling stopped
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PAGT_HEUR024 Maximum number of periods backwards reached; finite scheduling stopped typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to schedule a production or planning process due to constraints related to the time periods being considered.
Cause: Backward Scheduling Limit: The error indicates that the scheduling process has reached the maximum number of periods it can look back into the past for scheduling. This is often due to the configuration settings in the APO system that limit how far back the scheduler can go when trying to allocate resources or schedule production. Data Issues: There may be issues with the master data, such as incorrect lead times, production versions, or resource availability that prevent the scheduler from finding a feasible solution. Planning Parameters: The planning parameters set in the APO system may not be aligned with the actual production capabilities or constraints, leading
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PAGT_HEUR023 Successful scheduling attempt: Order &1 in period [&2, &3]
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR022 Period for material &1 could not be determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR025 Scheduling failed for &1 order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR027 Order &1 successfully reexploded using PPM/PDS &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.