How To Fix /SAPAPO/PAGT_HEUR024 - Maximum number of periods backwards reached; finite scheduling stopped


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 024

  • Message text: Maximum number of periods backwards reached; finite scheduling stopped

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PAGT_HEUR024 - Maximum number of periods backwards reached; finite scheduling stopped ?

    The SAP error message /SAPAPO/PAGT_HEUR024 Maximum number of periods backwards reached; finite scheduling stopped typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to schedule a production or planning process due to constraints related to the time periods being considered.

    Cause:

    1. Backward Scheduling Limit: The error indicates that the scheduling process has reached the maximum number of periods it can look back into the past for scheduling. This is often due to the configuration settings in the APO system that limit how far back the scheduler can go when trying to allocate resources or schedule production.

    2. Data Issues: There may be issues with the master data, such as incorrect lead times, production versions, or resource availability that prevent the scheduler from finding a feasible solution.

    3. Planning Parameters: The planning parameters set in the APO system may not be aligned with the actual production capabilities or constraints, leading to scheduling failures.

    Solution:

    1. Adjust Backward Scheduling Limits: Check the configuration settings for the backward scheduling limits in the APO system. You may need to increase the maximum number of periods that can be scheduled backward. This can typically be done in the planning book or in the configuration settings for the specific planning area.

    2. Review Master Data: Ensure that all relevant master data (e.g., production versions, lead times, resource availability) is correctly maintained and reflects the actual production capabilities.

    3. Check Planning Parameters: Review the planning parameters and settings in the APO system to ensure they are appropriate for your production environment. This includes checking the settings for finite scheduling, resource allocation, and any constraints that may be affecting the scheduling process.

    4. Run a Simulation: If possible, run a simulation or a test run of the scheduling process to identify any specific issues or bottlenecks that may be causing the error.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional insights or recommended actions.

    6. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance, especially if there are underlying system issues or bugs.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for planning book) or /SAPAPO/SCM1 (for checking the planning area) to analyze the planning data.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By addressing the underlying causes and adjusting the relevant settings, you should be able to resolve the error and allow the scheduling process to continue.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author