Message type: E = Error
Message class: /SAPAPO/OM_ERROR2 -
Message number: 024
Message text: At least one time stream required (shared or private)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR2024
- At least one time stream required (shared or private) ?The SAP error message /SAPAPO/OM_ERROR2024 indicates that at least one time stream is required for the operation you are trying to perform in the SAP Advanced Planning and Optimization (APO) module. This error typically occurs when you are working with planning books, data views, or other functionalities that require a time stream to be defined.
Cause: Missing Time Stream: The most common cause of this error is that the planning book or data view you are trying to use does not have a time stream defined. A time stream is essential for time-based planning activities. Incorrect Configuration: The configuration of the planning book or the data view may not be set up correctly, leading to the absence of a time stream. Data View Issues: If you are using a specific data view, it may not be linked to any time stream.
Solution: Check Planning Book Configuration: Go to the planning book configuration in the SAP APO system. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR2023
The resource type cannot be changed
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2022
No time stream
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2025
Single resources can only have available capacity of 0 or 1
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2026
Bucket dimension cannot be changed
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.