Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OM_ERROR2 -
Message number: 026
Message text: Bucket dimension cannot be changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR2026
- Bucket dimension cannot be changed ?The SAP error message
/SAPAPO/OM_ERROR2026
indicates that there is an issue with changing the bucket dimension in the context of SAP Advanced Planning and Optimization (APO). This error typically arises when you attempt to modify the bucket dimension of a planning object (like a planning book or a data view) that has already been defined and used in a certain way.Cause:
- Existing Data: The bucket dimension has already been set for the planning object, and there is existing data associated with it. Changing the bucket dimension would require reprocessing or re-evaluating this data.
- Incompatibility: The new bucket dimension you are trying to set may not be compatible with the existing configuration or data structure.
- Locked Objects: The planning book or data view might be locked or in use by another user or process, preventing changes.
Solution:
- Check Existing Data: Review the existing data associated with the planning object. If there is significant data that relies on the current bucket dimension, consider whether changing it is necessary.
- Create a New Planning Object: If changing the bucket dimension is essential, consider creating a new planning book or data view with the desired bucket dimension instead of modifying the existing one.
- Unlock Objects: Ensure that the planning book or data view is not locked by another user or process. If it is, wait for the lock to be released or contact the user who has it locked.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on changing bucket dimensions in your version of SAP APO.
- Contact SAP Support: If the issue persists and you cannot find a resolution, consider reaching out to SAP support for assistance.
Related Information:
By following these steps, you should be able to address the error and understand the implications of changing bucket dimensions in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_ERROR2025
Single resources can only have available capacity of 0 or 1
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2024
At least one time stream required (shared or private)
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2027
Incorrect dimension for buckets
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2028
Incorrect LineProcTimeMode
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.