Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OM_ERROR2 -
Message number: 023
Message text: The resource type cannot be changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR2023
- The resource type cannot be changed ?The SAP error message
/SAPAPO/OM_ERROR2023
indicates that there is an issue with changing the resource type in the Advanced Planning and Optimization (APO) module. This error typically arises when there is an attempt to modify a resource's type in a way that is not permitted due to existing dependencies or configurations.Cause:
- Existing Dependencies: The resource may already be linked to various planning objects, such as production orders, which restricts changes to its type.
- Configuration Settings: The system may have specific settings or configurations that prevent the modification of resource types once they have been defined.
- Data Integrity: Changing the resource type could lead to inconsistencies in the planning data, which is why the system restricts such changes.
Solution:
- Check Dependencies: Review any existing dependencies or assignments related to the resource. If the resource is linked to production orders, planned orders, or other planning objects, you may need to remove those links before changing the resource type.
- Resource Deactivation: If possible, deactivate the resource before attempting to change its type. This may involve temporarily removing it from any active planning scenarios.
- Consult Configuration: Check the configuration settings in the APO system to see if there are any restrictions on changing resource types. You may need to consult with your SAP Basis or APO configuration team.
- Use Alternative Approaches: If changing the resource type is not feasible, consider creating a new resource with the desired type and reassigning any relevant planning objects to this new resource.
- Documentation and Support: Refer to SAP documentation for any specific guidelines related to resource management in APO. If the issue persists, consider reaching out to SAP support for further assistance.
Related Information:
/SAPAPO/RES01
(Resource Maintenance) to view and manage resources.By following these steps, you should be able to address the error and make the necessary adjustments to your resources in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_ERROR2022
No time stream
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2021
Incorrect parameter values
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2024
At least one time stream required (shared or private)
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2025
Single resources can only have available capacity of 0 or 1
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.