Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/MAT -
Message number: 410
Message text: Entered number of periods is too big, value was adjusted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/MAT410
- Entered number of periods is too big, value was adjusted ?The SAP error message
/SAPAPO/MAT410 Entered number of periods is too big, value was adjusted
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a user attempts to perform a planning operation that involves a time horizon that exceeds the system's configured limits.Cause:
- Exceeding Time Horizon: The error is triggered when the number of periods (e.g., days, weeks, months) specified for a planning operation exceeds the maximum allowed by the system configuration.
- Configuration Settings: The maximum number of periods is often defined in the system settings, and if a user tries to input a larger value, the system automatically adjusts it to the maximum allowed value, which triggers this warning message.
Solution:
- Check Configuration Settings: Review the configuration settings in the SAP APO system to determine the maximum number of periods allowed. This can typically be found in the planning area settings or in the configuration of the specific planning function you are using.
- Adjust Input Values: If you are manually entering the number of periods, ensure that the value you are entering does not exceed the maximum limit set in the system.
- Modify Planning Area: If necessary, consider modifying the planning area settings to increase the maximum number of periods allowed, if it aligns with your business requirements.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the configuration of planning areas and the limits on periods.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or APO support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/MAT409
PP planning group &1 invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MAT408
Costs of repair cannot be higher than the procurment costs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MAT411
ABC indicator &1 is invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MAT412
Costs of repair cannot be higher than the procurment costs (&1 &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.