Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 709
Message text: Mode &1 does not have a latest start time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT709
- Mode &1 does not have a latest start time ?The SAP error message
/SAPAPO/CDPSOPT709 Mode &1 does not have a latest start time
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling. This error indicates that the system is unable to determine a latest start time for a specific mode in the planning process.Cause:
- Missing Data: The mode specified in the error message may not have been properly configured with the necessary data, such as production resources, capacity, or scheduling parameters.
- Incorrect Mode Configuration: The mode might not be set up correctly in the system, leading to the absence of a latest start time.
- Planning Object Issues: The planning object (like a product or resource) associated with the mode may not have the required attributes or settings.
- Time Period Issues: The time period for which the planning is being executed may not align with the available data for the mode.
Solution:
- Check Mode Configuration: Verify the configuration of the mode in the system. Ensure that it has been set up correctly with all necessary parameters, including capacity and scheduling details.
- Review Planning Object Settings: Check the settings for the planning object associated with the mode. Ensure that all required attributes are defined and that there are no inconsistencies.
- Update Data: If any data is missing or incorrect, update it accordingly. This may involve entering the latest start time or other relevant scheduling information.
- Check Time Period: Ensure that the time period for the planning run is valid and that it corresponds to the available data for the mode.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the mode and its configuration.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/CDPSOPT
(for optimization) to analyze and adjust the settings.By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT708
Mode &1 does not have an earliest start time
Check the production data model and the selected optimization horizon.How to fix this error? In particular, the activity can be pushed into the past...
/SAPAPO/CDPSOPT707
Operation of order &1 deallocated on resource &2 after end of horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT710
Activity &1 has a due date that cannot be met
What causes this issue? Activity &V1& has finish date &V2& which cannot be met.System Response Scheduling sets the earliest finish d...
/SAPAPO/CDPSOPT711
Order &1 can only be scheduled with a delay
What causes this issue? Under the following circumstances, the system must schedule order &V1& with a delay: For a pegging relationship betwe...
Click on this link to search all SAP messages.