Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 711
Message text: Order &1 can only be scheduled with a delay
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT711
- Order &1 can only be scheduled with a delay ?The SAP error message /SAPAPO/CDPSOPT711 Order &1 can only be scheduled with a delay typically occurs in the context of Advanced Planning and Optimization (APO) when there are constraints or conditions that prevent an order from being scheduled at the desired time. Here’s a breakdown of the potential causes, solutions, and related information for this error: Causes: Capacity Constraints: The production resources (e.g., machines, labor) may not have enough capacity available at the requested time to process the order. Material Availability: The required materials for the order may not be available at the time of scheduling, leading to a delay. Order Dependencies: There may be dependencies or relationships with other orders that affect the scheduling of the current order. Scheduling Parameters: The scheduling parameters set in the system (like lead times, setup times, etc.) may not allow for the order to be scheduled at the requested time. Resource Availability: The specific resource required for the order
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT710
Activity &1 has a due date that cannot be met
Scheduling sets the earliest finish data to &V3&.System Response Activity &V1& has finish date &V2& which cannot be met.What...
/SAPAPO/CDPSOPT709
Mode &1 does not have a latest start time
What causes this issue? Mode &V1& does not have a latest start time.System Response The optimizer can move the start time arbitrarily into t...
/SAPAPO/CDPSOPT712
Order &1 in dependency cycle &2
What causes this issue? Order &V1& is in a dependency cyle with number &V2&. Such cycles can be triggered through relationships withi...
/SAPAPO/CDPSOPT713
Storage characteristic not considered with deallocation funcitonality
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.