Message number: 707
Message text: Operation of order &1 deallocated on resource &2 after end of horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT707
- Operation of order &1 deallocated on resource &2 after end of horizon ?The SAP error message
/SAPAPO/CDPSOPT707
indicates that an operation of an order has been deallocated on a specific resource after the end of the planning horizon. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.Cause:
- Planning Horizon: The operation is scheduled to start or finish beyond the defined planning horizon. The planning horizon is the timeframe within which the system can plan and allocate resources.
- Resource Availability: The resource may not be available for the operation due to maintenance, unavailability, or other scheduling conflicts.
- Order Changes: Changes to the order or its operations may have pushed the operation beyond the planning horizon.
- Configuration Issues: Incorrect settings in the resource or order configuration may lead to this error.
Solution:
- Adjust Planning Horizon: Extend the planning horizon in the APO settings to include the operation's scheduled time. This can be done in the configuration settings for the planning area.
- Check Resource Availability: Ensure that the resource is available for the operation during the planned time. If the resource is not available, consider rescheduling the operation or using an alternative resource.
- Review Order and Operation Settings: Check the order and its operations for any changes that may have caused the operation to fall outside the planning horizon. Make necessary adjustments to the order.
- Re-schedule the Order: If the operation is indeed valid but scheduled incorrectly, consider re-scheduling the order to bring it within the planning horizon.
- Consult Documentation: Review SAP documentation or consult with your SAP support team for specific configuration settings related to your APO environment.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/CDPS
(for detailed scheduling) to analyze the situation further.By addressing the underlying causes and following the suggested solutions, you should be able to resolve the error and ensure that operations are properly scheduled within the planning horizon.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT706
Unknown key word &1 will be ignored
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT705
&1 '&2' unknown, optimizer uses &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT708
Mode &1 does not have an earliest start time
Check the production data model and the selected optimization horizon.How to fix this error? In particular, the activity can be pushed into the past...
/SAPAPO/CDPSOPT709
Mode &1 does not have a latest start time
What causes this issue? Mode &V1& does not have a latest start time.System Response The optimizer can move the start time arbitrarily into t...