How To Fix /SAPAPO/CDPSOPT274 - Activity &1 has multiple predecessor


/SAPAPO/CDPSOPT274 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 274

  • Message text: Activity &1 has multiple predecessor

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT274 - Activity &1 has multiple predecessor ?
    The SAP error message /SAPAPO/CDPSOPT274 Activity &1 has multiple predecessors typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the scheduling of activities in a project or production planning scenario. This error indicates that the specified activity has been assigned multiple predecessor activities, which can lead to conflicts in scheduling.
    
    Cause: Multiple Predecessors: The activity in question is linked to more than one predecessor, which can create ambiguity in the scheduling process. In a scheduling context, an activity can only have one predecessor to maintain a clear sequence of operations. Incorrect Configuration: The configuration of the project or planning scenario may not be set up correctly, leading to multiple predecessors being assigned inadvertently. Data Integrity Issues: There may be issues with the data integrity in the planning model, such as incorrect or duplicate entries in the activity relationships.
    Solution: Review Activity Relationships: Check the relationships of the activity in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker