How To Fix /SAPAPO/CDPSOPT276 - Time relationship between activity &1 and &2 has an undefined interval


/SAPAPO/CDPSOPT276 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 276

  • Message text: Time relationship between activity &1 and &2 has an undefined interval

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT276 - Time relationship between activity &1 and &2 has an undefined interval ?
    The SAP error message /SAPAPO/CDPSOPT276 indicates that there is an issue with the time relationship between two activities in the SAP Advanced Planning and Optimization (APO) module. Specifically, it suggests that the time interval between the two activities is not defined correctly, which can lead to scheduling issues.
    
    Cause: Undefined Time Relationship: The error typically arises when the system cannot determine a valid time relationship between two activities. This could be due to: Missing or incorrect start and end dates/times for one or both activities. Overlapping activities that do not have a clear sequence. Incorrectly defined lead times or lag times in the planning setup.
    Configuration Issues: There may be configuration issues in the planning settings or in the master data that define how activities relate to one another. Data Integrity Issues: Inconsistent or incomplete data in the activity definitions or in the planning object structure can also lead to this error.
    Solution: Check Activity Definitions: Review the definitions

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant