Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 273
Message text: Activitiy &1 has multiple successor
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT273
- Activitiy &1 has multiple successor ?The SAP error message
/SAPAPO/CDPSOPT273
indicates that there is an issue with the activity in the SAP Advanced Planning and Optimization (APO) module, specifically related to the scheduling of activities in a project or production plan. The message states that the activity identified by&1
has multiple successors, which can lead to ambiguity in the scheduling process.Cause:
The error typically arises when:
- An activity in a project or production plan is defined with more than one successor, which can create conflicts in the scheduling logic.
- The system is unable to determine a clear sequence of execution for the activities due to multiple dependencies.
Solution:
To resolve this error, you can take the following steps:
Review Activity Dependencies:
- Go to the activity in question and check its successor relationships. Ensure that each activity has a clear and unique successor.
- If there are multiple successors, determine if this is intentional or if it needs to be adjusted.
Modify Successor Relationships:
- If the multiple successors are not required, modify the activity to have a single successor. This can often be done in the project or production planning interface where you manage activities and their relationships.
Check for Logical Errors:
- Ensure that the logical flow of the project or production plan is correct. Sometimes, the design of the plan may need to be revisited to ensure that it aligns with the intended workflow.
Consult Documentation:
- Refer to SAP documentation or help resources for guidance on managing activity dependencies in APO. This can provide insights into best practices and common pitfalls.
Testing:
- After making changes, test the scheduling again to ensure that the error is resolved and that the activities are scheduled correctly.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT272
Activitiy &1 has multiple successors
What causes this issue? Activity &V1& has activity &V2& as multiple successor of type &V3&.System Response This situation do...
/SAPAPO/CDPSOPT271
Activity &1 has multiple predecessors
Activity &V1& has activity &V2& as a multiple predecessor of type &V3&.System Response This situation does not influence the...
/SAPAPO/CDPSOPT274
Activity &1 has multiple predecessor
Activity &V1& has activity &V2& as a multiple predecessor of type &V3& via mode &V4&.Error message extract from SAP s...
/SAPAPO/CDPSOPT275
Mode &2 of activity &1 has a variable net duration
Mode &V2& of activity &V1& has variable net duration. The net duration of an activity mode must be fixed.Error message extract from S...
Click on this link to search all SAP messages.