How To Fix /SAPAPO/CDPSOPT270 - Activity &1 exceeds the capacity of resource &2 in mode &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 270

  • Message text: Activity &1 exceeds the capacity of resource &2 in mode &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT270 - Activity &1 exceeds the capacity of resource &2 in mode &3 ?

    The SAP error message /SAPAPO/CDPSOPT270 Activity &1 exceeds the capacity of resource &2 in mode &3 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with capacity planning and scheduling. This error indicates that a specific activity (identified by &1) is trying to consume more capacity than what is available for a particular resource (identified by &2) in a specified mode (identified by &3).

    Cause:

    1. Capacity Constraints: The resource has a defined capacity limit, and the planned activity exceeds this limit.
    2. Incorrect Resource Configuration: The resource may not be configured correctly, leading to an underestimation of its available capacity.
    3. High Demand: There may be an unexpected increase in demand for the activity, leading to a situation where the planned activities exceed the available capacity.
    4. Scheduling Conflicts: Other activities may be scheduled at the same time, consuming the resource's capacity.
    5. Mode Misconfiguration: The mode in which the resource is being used may not be set up correctly, leading to capacity issues.

    Solution:

    1. Review Resource Capacity: Check the capacity settings for the resource in question. Ensure that the capacity is set correctly and that it reflects the actual available capacity.
    2. Adjust Activity Planning: If possible, adjust the planned activities to ensure they do not exceed the available capacity. This may involve rescheduling or reducing the quantity of the activity.
    3. Increase Resource Capacity: If the demand justifies it, consider increasing the capacity of the resource to accommodate the planned activities.
    4. Check for Conflicts: Review the scheduling of other activities that may be using the same resource at the same time. Adjust the schedule to avoid conflicts.
    5. Mode Configuration: Ensure that the mode configuration for the resource is correct and that it aligns with how the resource is intended to be used.
    6. Use Capacity Planning Tools: Utilize SAP APO's capacity planning tools to analyze and optimize resource utilization.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/CC01 (for capacity planning) or /SAPAPO/CDPS (for detailed scheduling) to analyze the situation further.
    • Capacity Planning Reports: Use reports available in SAP APO to monitor resource utilization and identify potential bottlenecks.
    • Documentation: Refer to SAP documentation for detailed guidelines on capacity planning and resource management in APO.
    • Support: If the issue persists, consider reaching out to SAP support or consulting with an SAP APO expert for further assistance.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and optimize your resource utilization in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author